Greenheck Fan GGH20 manual Using the Uni-Strut Option #2, Using the Threaded Rod Option #3

Page 10

Using the Uni-Strut - Option #2

1.The uni-strut (supplied by others) that holds the hood up cantilevers over the end of the hood and is mounted to the supply plenum hanger brackets.

Option #3

Threaded Rod

supplied by others

Threaded Rod

Option #2

The uni-strut (U channel) that holds the hood up, cantilevers over the end of the hood and is mounted to the Air Curtain Supply Plenum (ASP) hanger brackets

END VIEW

Hood

Variable Supply Plenum

(HSP or VSP)

Air Curtain Supply Plenum

(ASP)

Using the Threaded Rod - Option #3

1.Insert 1/2 in. (12.7 mm) diameter threaded rod (by others) into hanger brackets on the supply plenum top. Raise and hang the external supply plenum from adequate roof or ceiling supports.

2.The external supply plenum should be resting lightly against the hood. The hood is used to position the plenum only, it is not intended to support the plenum. All hanger brackets must be used and the plenum must be properly supported while lifting to prevent damage or distortion. The supply plenum must be hung level to operate properly.

(Optional fastening of supply plenum to hood. See directions).

3.It is recommended that caulk be applied at the mating seams and surfaces of the plenum, the hood, and the wall. If the supply plenum is next to a wall, you will also need to caulk around the surface next to the wall. Caulk the joints with NSF Approved silicone caulk (GE SCS1000, or its equivalent). The caulk is not provided.

Installing the Supply Duct Collar to the Plenum

1.Place the duct collar(s) over the opening, fastening with tack-welds at 1 to 2 in. (2.54 to 5.08 cm) intervals, or sheet metal screws at 3 to 6 in.

(7.62 to 15.24 cm) intervals.

Supply Duct

Connection

Supply duct connection to be tack-welded with 1 to 2 inch tacks or sheet metal screws at 3 to 6 inch spacing to hood.

External Supply Plenum Weights, Dimensions and Supply Rates

 

Weight

Width

Height

Length per

 

 

External Supply

section

 

Recommended

 

 

 

 

 

 

 

Plenum Type

(lbs/ft)

(kg/ft)

(in)

(mm)

(in)

(mm)

(ft)

(m)

 

Supply Rate

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Back Supply

35.0

15.878

6

152.4

Variable

Variable

3 to 16

.91 to

 

145 cfm/ft

4.88

 

(246.36 m3/hr)

 

 

 

 

 

 

 

 

 

Air Curtain Supply

9.5

4.31

14

355.6

10

254

3 to 16

.91 to

 

110 cfm/ft

• 14 inch

4.88

 

(186.89 m3/hr)

 

 

 

 

 

 

 

 

Air Curtain Supply

12.5

5.67

24

609.6

10

254

3 to 16

.91 to

 

145 cfm/ft

• 24 inch

4.88

 

(246.36 m3/hr)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

curtain

0-80 cfm/ft

 

 

 

 

 

 

 

 

.91 to

(0-135.92 m3/hr)

Variable Supply

16.0

7.26

12

304.8

18

457.20

3 to 16

 

4.88

face

80-160 cfm/ft

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(135.92 -271.84 m3/hr)

 

 

 

 

 

 

 

 

 

 

Horizontal Supply

14.0

6.35

12

304.8

18

457.20

3 to 16

.91 to

 

150 cfm/ft

4.88

 

(254.85 m3/hr)

 

 

 

 

 

 

 

 

 

10 Model GGH2O

®

Image 10
Contents 473380 Auto-Cleaning HoodModel GGH2O General Safety Information Grease Grabber H 2OUnpacking Inspection and Maintenance during StorageReceiving HandlingTable of Contents Grease Grabber H2O System FunctionManual Engagement Cleaning CycleFire Mode Automatic EngagementGrease Grabber H2O Control Cabinet System ComponentsHood Graphic Keypad= 770 lbs Hood Width and Base WeightsUnpacking = 890 lbsInstallation Overview Filler PanelsDouble Island Style Hoods Installing U-Channel StripHood Hanging Height Continuous Capture Plenum HoodsDuctwork Installing External Supply PlenumsUsing the Supply Plenum Clip Option #1 ExhaustInstalling the Supply Duct Collar to the Plenum Using the Uni-Strut Option #2Using the Threaded Rod Option #3 External Supply Plenum Weights, Dimensions and Supply RatesInstalling the Supply Duct Collar Using the UL Listed Fastener ProvidedInstalling the Back Supply Plenum Hanging the Back Supply PlenumHanging the Hood Air DiffusersInstalling Enclosure Panels Installing End SkirtsInstalling Backsplash Panels Flat backsplash panel Material gauge StainlessInstalling Duct Collar Overview of exhaust and supply plenum locationsPlumbing Pump InstallationPlumbing Connections Electrical Wiring Detergent Tank InstallationPreventative Maintenance ElectricalTimer Programming Hour / 7 Day Initiating the wash cycle Initial System Start-UpDaily Operation of the GGH2O Hood Interior of CabinetSequence of Operation Grease Grabber H2O Normal Fan OperationHood Length Airflow Testing ProcedureCalculation Example Test Location Off left in inches Velocity Reading fpmAmerex Wiring Plan View PRMAnsul Wiring Plan View Ansul SNAP-ACTION SwitchWiring Diagram COMFilters MaintenanceCapture Tank FloatsWash Nozzles TroubleshootingReplacement Parts Repair KitsMiscellaneous Grease Grabber H2O Start-Up ChecklistStart-Up Hook-UpMaintenance Log Warranty