Greenheck Fan GGH20 manual Ductwork, Installing External Supply Plenums, Exhaust

Page 9
Supply Plenum Clip

Ductwork

Exhaust

As specified in NFPA 96, Ch. 7.5 (latest edition), exhaust duct systems must be constructed in the following manner:

Materials: Ducts shall be constructed of and supported by carbon steel not less than 1.37 mm (0.054 in.) (No. 16 MSG) in thickness or stainless steel not less than 1.09 mm (0.043 in.) (No. 18 MSG)

in thickness.

Installation: All seams, joints, penetrations, and duct to hood collar connections shall have a liquidtight external weld. If you have an Automatic Fire Damper please refer to that manual for installation instructions now.

Supply

Supply ductwork (where applicable) should be connected to the hood in a manner approved by the local code authorities.

For proper installation of duct collars when they are shipped unattached see Installing Duct Collars on page 10.

NOTE

For hoods with fire dampers in the exhaust and supply duct collars, an access panel for cleaning and inspection shall be provided in the duct. This panel shall be as close to the hood as possible but should not exceed 18 in. (45.72 cm).

Installing External Supply Plenums

 

Option #2

 

Uni-Strut supplied by others

 

TOP VIEW

 

HOOD

 

Option #1

 

For plenums < than or = 96 inches

 

Two (2) clips are needed.

UTILITY

For plenums > than 96 inches

Three (3) clips are needed.

CABINET

The third clip is located in the

center of the plenum length.

 

Option #1

 

Attach hanging clip to hood

 

standing seam with the

 

supplied ‘C’ clamps.

 

Optional: Drill and bolt a

 

1/4-20 SS bolt through the

 

clip and hood standing seam

11.5

 

 

TOP VIEW

23.5

SUPPLY PLENUM

 

Hanger Bracket

Option #1

Hanging clip could be 23.5 inches from end if there is a utility cabinet on the end of the hood.

Using the Supply Plenum Clip - Option #1

1.Bolt the hanging clip to the supply plenum. Two clips are needed for plenums less than 96 in. (243.84 cm) long and three for plenums greater than 96 in. (243.84 cm). The

third clip is located in the center of the plenum length. If there is a utility cabinet, the hanging clip should be

23.5 in. (59.69 cm) from the end to the hood.

2.Using the c-clamps provided, clamp the supply plenum hanging clip to the hood standing seam. Option: Drill and bolt a 1/4-20 SS bolt through the clip and hood standing seam.

Option #1 : Hanging Clip

‘C’ Clamp

Hood Standing Seam

Hanging Clip bolted to plenum shell

Hanging Clip

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HOOD FRONT

SUPPLY PLENUM SHELL

 

 

 

 

 

 

 

NOTE

The supply plenum is provided with plenum clips that assist in hanging the plenum. The plenum should not be hung only with the plenum clips; threaded rod or uni-strut must also be used.

®

Model GGH2O 9

Image 9
Contents Model GGH2O General Safety Information Auto-Cleaning Hood473380 Grease Grabber H 2OReceiving Inspection and Maintenance during StorageUnpacking HandlingGrease Grabber H2O System Function Table of ContentsFire Mode Cleaning CycleManual Engagement Automatic EngagementHood System ComponentsGrease Grabber H2O Control Cabinet Graphic Keypad Unpacking Hood Width and Base Weights = 770 lbs = 890 lbsFiller Panels Installation OverviewHood Hanging Height Installing U-Channel StripDouble Island Style Hoods Continuous Capture Plenum HoodsUsing the Supply Plenum Clip Option #1 Installing External Supply PlenumsDuctwork ExhaustUsing the Threaded Rod Option #3 Using the Uni-Strut Option #2Installing the Supply Duct Collar to the Plenum External Supply Plenum Weights, Dimensions and Supply RatesInstalling the Back Supply Plenum Using the UL Listed Fastener ProvidedInstalling the Supply Duct Collar Hanging the Back Supply PlenumAir Diffusers Hanging the HoodInstalling End Skirts Installing Enclosure PanelsFlat backsplash panel Material gauge Stainless Installing Backsplash PanelsOverview of exhaust and supply plenum locations Installing Duct CollarPump Installation PlumbingPlumbing Connections Preventative Maintenance Detergent Tank InstallationElectrical Wiring ElectricalTimer Programming Hour / 7 Day Daily Operation of the GGH2O Hood Initial System Start-UpInitiating the wash cycle Interior of CabinetNormal Fan Operation Sequence of Operation Grease Grabber H2OCalculation Example Airflow Testing ProcedureHood Length Test Location Off left in inches Velocity Reading fpmPRM Amerex Wiring Plan ViewAnsul SNAP-ACTION Switch Ansul Wiring Plan ViewCOM Wiring DiagramCapture Tank MaintenanceFilters FloatsReplacement Parts TroubleshootingWash Nozzles Repair KitsStart-Up Grease Grabber H2O Start-Up ChecklistMiscellaneous Hook-UpWarranty Maintenance Log