Installing Backsplash Panels

Flat backsplash panel

Material gauge – Stainless

Wall

Heigth

Length

NOTE

Panels up to 47 inches (119.4 cm) wide ship in one piece. Over 47 inches (119.4 cm) in multiple pieces.

1.After the hood is hung in position, slide the flat flange of the backsplash panel behind the back of the hood.

Note: If the backsplash panel length is greater than 45 in. (114.3 cm), it will be shipped in multiple pieces.

2.After the backsplash panel has been positioned, drill holes in the panel and fasten to the wall. (Fasteners provided by others).

Note: The holes should be spaced to adequately secure the panel to the wall.

3.Caulk the joints between the hood and the backsplash panel with NSF Approved silicone caulk (GE SCS1000, or its equivalent). The caulk is not provided.

4.Caulk the joint between the backsplash panels when multiple panels are required, with NSF Approved silicone caulk (GE SCS1000, or its equivalent). The caulk is not provided.

Hood End Panel

Hood Front Panel

 

Insulated backsplash panel

Material gauge – Stainless

Insulation – 1 inch (25.4 mm)

1 inch (25.4 mm)

Wall

Height

Length

NOTE

Panels up to 45 inches (114.3 cm) wide ship in one piece. Over 45 inches (114.3 cm) in multiple pieces.

Slide flange behind back of the hood.

Backsplash Panel

Section view of backsplash panel overlap

Holes should be spaced to adequately secure the panel to the wall studs. (Hole spacing and fasteners provided by others).

14 Model GGH2O

®

Image 14
Contents 473380 Auto-Cleaning HoodModel GGH2O General Safety Information Grease Grabber H 2OUnpacking Inspection and Maintenance during StorageReceiving HandlingTable of Contents Grease Grabber H2O System FunctionManual Engagement Cleaning CycleFire Mode Automatic EngagementGrease Grabber H2O Control Cabinet System ComponentsHood Graphic Keypad= 770 lbs Hood Width and Base WeightsUnpacking = 890 lbsInstallation Overview Filler PanelsDouble Island Style Hoods Installing U-Channel StripHood Hanging Height Continuous Capture Plenum HoodsDuctwork Installing External Supply PlenumsUsing the Supply Plenum Clip Option #1 ExhaustInstalling the Supply Duct Collar to the Plenum Using the Uni-Strut Option #2Using the Threaded Rod Option #3 External Supply Plenum Weights, Dimensions and Supply RatesInstalling the Supply Duct Collar Using the UL Listed Fastener ProvidedInstalling the Back Supply Plenum Hanging the Back Supply PlenumHanging the Hood Air DiffusersInstalling Enclosure Panels Installing End SkirtsInstalling Backsplash Panels Flat backsplash panel Material gauge StainlessInstalling Duct Collar Overview of exhaust and supply plenum locationsPlumbing Connections Pump InstallationPlumbing Electrical Wiring Detergent Tank InstallationPreventative Maintenance ElectricalTimer Programming Hour / 7 Day Initiating the wash cycle Initial System Start-UpDaily Operation of the GGH2O Hood Interior of CabinetSequence of Operation Grease Grabber H2O Normal Fan OperationHood Length Airflow Testing ProcedureCalculation Example Test Location Off left in inches Velocity Reading fpmAmerex Wiring Plan View PRMAnsul Wiring Plan View Ansul SNAP-ACTION SwitchWiring Diagram COMFilters MaintenanceCapture Tank FloatsWash Nozzles TroubleshootingReplacement Parts Repair KitsMiscellaneous Grease Grabber H2O Start-Up ChecklistStart-Up Hook-UpMaintenance Log Warranty