US CA
2
Contents
SAFETY PRACTICES & PRECAUTIONS | ||
FEATURES |
| 5 |
INSTALLATION INSTRUCTIONS |
| |
Specifications | 6 | |
Base Cabinet Installation | 6 | |
Wall Cabinet Installation | 7 | |
Step 1 | - Removing the Drawer | 8 |
Step 2 | - Mounting Installation of Chassis | |
Step 3 | - Replacing the Drawer | 11 |
OPERATING INSTRUCTIONS |
| |
Operational Guide | 12 | |
Preheat Time and Temperature Selector | 12 | |
Proofing Yeast Dough | 12 | |
CARE AND MAINTENANCE |
| |
Cleaning the Warming Drawer | 13 | |
TEMPERATURE SETTINGS | 14 | |
SERVICE |
| 15 |
WARRANTY |