Samsung RF26VABBP user manual Ice production, Normal Use

Page 25

Operating your SAMSUNG French Door Refrigerator

Ice production

Normal Use

To fill ice bucket to maximum capacity after installation, make sure to do the following steps.

1. Allow your refrigerator to operate and cool down for 24 hours (or 1 full day).

2. Waiting 24 hours will allow your ice maker to cool properly.

3. Dispense 4 to 6 ice cubes into the glass.

4. After 8 and 16 hours, dispense a full glass of ice at each time.

Whenever all ice is used at one time, the above step 3 and 4 must be repeated (before dispense the first 4 to 6 ice cubes, it needs waiting 8 hours). This will replenish the ice cubes and ensure maximum ice production.

Test button

CAUTION In case ice doesn’t come out, pull out the ice bucket and press test button

Test Button

located on the right side of ice maker.

The water tank’s capacity is approximately one third (1/3) of a gallon.

Please wait 1 second before removing the cup after dispensing water to prevent spills. Do not pull out the lever dispenser after taking out ice or water. It comes back automatically. Ice is made in cubes. When you select “Crushed”, the icemaker grinds the ice cubes into crushed ice.

When you dump the ice from the ice bucket, you should press the

CAUTION dispenser lever once with ‘ICE CUBED’ or ‘CRUSHED’ function ON to get new ice faster after replacing the ice bucket in the refrigerator.

OPERA02 TING

Operating _25

Image 25
Contents Refrigerator Model # Key features of your new refrigeratorSerial # Severe Warning Signs Safety InformationDo not use aerosols near the Refrigerator Do not disassemble or repair the Refrigerator by yourself Do not insert the power plug with wet handsUnplug the Refrigerator before changing the interior light Refrigerator must be safely groundedDo not store articles on the top of the appliance Never unplug your Refrigerator by pulling on the power cordDo not put your hands under the appliance Service Warranty and Modification Safety InformationContents Getting Ready to Install the Refrigerator Setting up your French Door RefrigeratorRemoving the refrigerator doors Setting UP the RefrigeratorTools you will need Disassemble the Refrigerator doorsEach side of the top cap and the one Disassemble the freezer drawer Assemble the Refrigerator doors ReattaChing the RefRigeRatoR dooRsTop Table cap 1 and close the doors Assemble the freezer drawer Adjusting the support for extension shelfRF26V Adjusting the doorsWhen the Left door is lower than the Right door When the Left door is higher than the Right doorMaking Minor Adjustments Between Doors Adjusting the Freezer Drawer Level Checking the Water Dispenser Line Connecting to the water supply lineConnecting the water line to the Refrigerator Installing the Water LineInstalling the water filter Reverse Osmosis Water Supply Operating your Samsung French Door Refrigerator Using the control panelPower Cool Using the Digital DisplayFilter Indicator Cubed Ice , Crushed Ice , WaterControlling the Temperature Using the Ice Dispenser Using the ICE and Cold Water DispenserUsing the Water dispenser Using the Ice Off FunctionNormal Use Ice productionParts and FEATURESRF267 Parts and FEATURESRF26V Storing Food in the Refrigerator Storing FoodStoring Food in the Freezer Drawer Using the tilting pocket Using the Cool Select Pantry RF267Selection Button Door Bins & Dairy Compartment Removing the Refrigerator AccessoriesTempered Glass Shelves Vegetable & Fruit DrawersCool Select Pantry RF267 Using the DoorsTilting Pocket Removing the Freezer AccessoriesAuto Pull out Drawer Freezer Drawer BinCleaning the Refrigerator Changing the Interior Lights in the Refrigerator Changing the Interior LIGHTsChanging the Interior Lights in the Freezer Drawer Changing the Water Filter Ordering replacement Water FilterParticulate 10,566,666 Water Filter ChartWater Filter Certification Foods Refrigerator Freezer Storage Tips Food Storage TipsSources Troubleshooting RF26V RF267Samsung Refrigerator 26 Cubic Feet and Larger Capacity WarrantySamsung Customer Care Center