Sea Frost BG 2000 installation instructions

Page 31

Figure 1

31

Image 31
Contents Operation & Installation Instructions Table of Contents View of the Future Controls BG 2000 OperationDefrosting ICE MakingHarvesting ICE Storage of ICE CubesRoutinely Check BG 2000 MaintenanceCleaning Routine Service and InspectionLAY-UP Winterizing HOW Refrigeration Works Page Tube Bending InstallationTube Handling Tube CuttingPage Step DrawingReconnecting PRE-SWAGED Fittings Mounting Service AccessCondensing Unit Location and Mounting Receiver Filter Drier RFD VisibilityInstalling the Thermostatic Expansion Valve Final Assembly Pump InstallationRunning the Tubing AC Line Circuit Thermostat WiringConnection Access ThermostatRefrigerant Wiring the PumpRefrigerant Handling and Safety General Safety this is IMPORTANT. Read thisAccess to the System Service Ports Procedures for Working with R-404aGauges Disconnecting GaugesVenting the Gauge SET Evacuation Leak Test Commissioning Procedure Evacuation with a Vacuum PumpLeak Checking NEW System Charging Introducing Initial ChargeLeak Checking a Charged System About Pressures Special Note To Check with BubblesTo Check with AN Electronic Detector If a Leak is DetectedReading the Sight Glass Proper Charge Amount RFD Sight Glass DetailGeneral Information Discharging the System Reclaiming Checking the Refrigerant Charge Periodic InspectionHigh Pressure CUTOUT/MANUAL Reset Button Troubleshooting Charge Loss Indicates a Leak That Must be Corrected Call US with ANY Questions BG 2000 Specifications and Operating Characteristics Page Water Circuit Page Page Page Thermostat Calibration Instructions Holdover Plates Stainless Steel Evaporator Plates