Hill Phoenix ORBH, ONRBH manual Narrow Glass Door Reach-in Beverage Merchandiser

Page 32

CASE OPERATION

Narrow Glass Door Reach-in Beverage Merchandiser

ONRB - 2, 3, 4 & 5-door

Electrical Data

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

High Efficiency

Anti-Condensate

 

Defrost Heaters

 

 

 

 

 

 

Standard Fans

Fans

Heaters

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fans per

120 Volts

120 Volts

120 Volts

208 Volts

240 Volts

 

 

Model

Case

Amps

Watts

Amps

Watts

Amps

Watts

Amps

Watts

Amps

Watts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ONRB

2-door

2

1.00

60

0.31

18.4

1.01

121

4.39

914

5.06

1215

 

 

 

3-door

3

1.50

90

0.46

27.6

1.49

179

4.96

1032

5.71

1370

 

 

 

4-door

4

2.00

120

0.61

36.8

1.96

235

6.51

1355

7.55

1813

 

 

 

5-door

5

2.50

150

0.77

46.0

2.40

288

7.96

1655

9.17

2201

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lighting Data

 

 

 

 

 

 

 

 

 

 

 

Typical per

Maximum

 

 

 

 

Light Row

Lighting

 

 

 

 

120 Volts

120 Volts

 

 

Model

Amps

Watts

Amps

Watts

 

 

ONRB

2-door

NA1

NA

1.50

180

 

 

 

3-door

NA

NA

1.90

228

 

 

 

4-door

NA

NA

2.40

288

 

 

 

5-door

NA

NA

2.90

348

 

 

 

 

 

 

 

 

 

1 Not applicable.

Guidelines & Control Settings

 

 

 

 

 

 

 

 

 

 

 

 

 

Coil

Evaporator

Superheat Set

Discharge Air

Return Air

Discharge Air Velocity5

 

 

Model

BTUH/door3

Type

(°F)

Point @ Bulb (oF)

(°F)

(°F)

(FPM)

 

 

ONRB2 - Deli/Dairy

8304

Enh.

32

6-8

36

38

460

 

 

ONRB2 - Beverage

8004

Enh.

34

6-8

38

40

460

 

 

 

 

 

 

 

 

 

 

 

2All data listed is for an ONRB configured with 20” shelves.

3BTUHs/door listed are for parallel operation. Conventional ratings may be approximated by multiplying listed rating by 1.04.

4High efficiency fans reduce refrigeration load by 96 BTUHs/fan.

5Average discharge air velocity at peak of defrost.

Defrost Controls

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Electric Defrost

Timed Off Defrost

Hot Gas Defrost

Reverse Air Defrost

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Model

Defrosts

Run-Off

Fail-safe

Termination

Fail-safe

Termination

Fail-safe

Termination

Fail-safe

Termination

 

 

Per Day

Time (min)

(min)

Temp. (°F)

(min)

Temp. (°F)

(min)

Temp. (°F)

(min)

Temp. (°F)

 

 

ONRB

46

6 - 8

30

47

30

40

24

47

- - -7

- - -

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6If timed off defrost is utilized. If electric or hot gas defrost is utilized case only requires 1 defrost per day.

7NOTE: - - - not an option on this case model.

Medium Temperature Defrost Schedule

No. Per Day

Hours

112 midnight

212 am - 12 pm

36 am - 2 pm - 10 pm

412 - 6 am - 12 - 6 pm

All measurements are taken per ARI 1200 - 2002 specifications.

COMPONENT

28

Image 32
Contents Handbook Page Hill Phoenix Page Table of Contents Page General Information General Information Model ORBModel Orbh CoilModel Onrb Plenum CoilModel Onrbh Plenum CoilBasehorse Location for Model ONRB, Onrbh ORB & Orbh Narrow Door CaseFor Easier Installation Cases Move onLine UP Remove Outriggers Trim OUT Color Refrigeration Piping HOW to Remove Kickplate Lift UP from J Rail and Pull OUT PlumbingElectrical Hookup Anthony Frames Ballast Locations Door Models Wiring DIAGRAMS- ORB, Orbh Onrb & Onrbh Door 12’ ORB, ORBH, Onrb & Onrbh Wiring DIAGRAMS-ORB & Orbh Wiring DIAGRAMS- GFI Case Operation High Glass Door Reach-in Beverage Merchandiser Narrow Glass Door Reach-in Beverage Merchandiser High Narrow Glass Door Reach-in Beverage Merchandiser Defrost and Temp Control Discharge Return AIR GRILL...4USE and Maintenance Fans DoorParts Ordering Model ORB, ORBH, Onrb & Onrbh Procedure Appendix a Page Warranty Maintenance & Case Care