U-Line 2015WCOL manual Go on to 5 Adjust Door

Page 11

2015WC/2015WCOL Wine Captain®

 

 

Tape

Door

 

Frame

 

Overlay

 

Frame

Figure 20

 

3.Secure the front of the door to the back of the overlay frame using tape on all four corners, as shown in Figure 20. Make sure all four edges are aligned.

Note: The door frame is designed with a slight amount of “play” to square it to the overlay frame.

6.Remove all traces of tape securing overlay frame to door frame.

7.Starting at the corners and working toward the center, push the door gasket back into place. Make sure gasket is seated on all four sides.

Installing the Door

IMPORTANT

Pivot posts must be clean. Closers must also be clean and greased to ensure proper operation.

1.Insert pivot post into bottom hinge, making sure to tighten only until post is level with outside of hinge.

2.Install door closer. See Figure 26 on Page 12. Be sure that bosses on closers align with holes in hinge.

Pivot Post

Rear View

of

Door and

Overlay Frame

Punch Pilot Holes for use with #6 x 1" Pan-head Screws – 10 Places

Top Pivot Plate

Figure 21

4.Place door and overlay frame on a flat, clean protective surface. Use the door frame holes as a guide to lightly punch pilot holes for the #6 x 1" pan-head screws. See Figure 21.

5.Attach the door to the overlay frame using the #6 x 1" wood screws.

IMPORTANT

If you decide to drill pilot holes, remove the door and do not use a drill bit larger than 7/64". Do not drill deeper than 3/8". Door frame and overlay frame must be aligned properly or the door will not operate correctly.

Figure 22

3.Holding door upright with top of door tilted forward, place hole of pivot plate onto bottom hinge screw pin. Be sure that bosses on closers align with holes in pivot plate.

4.Tilt top of door into position and install top hinge screw pin. See Figure 22. Tighten only until post is level with top of hinge.

5.Go on to 5 Adjust Door.

02/2005

11

www.U-LineService.com

Image 11
Contents 2015WC Wine Captain 2015WCOL Wine Captain with Overlay Follow Safety Precautions ContentsInspection General PrecautionsInspect and Plan Tools/Materials RequiredPrepare Site Exterior CleaningCut-Out Dimensions Reversing the Door Product DimensionsDoor Swing/Clearances Information Environmental Requirements Power SupplyOther Site Requirements Prepare Racks and Door Frame Side-By-Side Installation InstructionsAdding a Final Finish Coat to Wood Trim Frame Preparation Staining Wood Trim a Different ColorOverlay Frame Typical routing dimensions are shown in Figure Preparing Door Installation InstructionsGo on to 5 Adjust Door Checking Door Alignment Adjusting Door AlignmentAdjust Door Prepare Power Supply Level the Unit Electrical Specifications Leveling InformationInstallation Tip Install the Unit Anti-Tip Bracket InstallationStart-Up for the First Time Installation TroubleshootingInitial Start-Up Start-Up Troubleshooting Who to Call Service Information