Sub-Zero Freezer installation instructions T E P R E P a R AT I O N

Page 4

BUILT-INI N S TA L L AT I O N S P E C I F I C AT I O N S

INSTALLATION S P E C I F I C AT I O N S

 

Make sure that the actual equipment that was

S I T E P R E P A R AT I O N

shipped to you matches the design you are

Make sure that the finished rough opening

expecting to install. The Sub-Zero Built-In line

where the Built-In unit is to be installed is

offers the following design alternatives—

properly prepared. Refer to the Overall Dimen-

framed, overlay and stainless steel models.

sions and Installation Specifications for your

Each of these design options has specific

specific model on the following pages. These

installation requirements, which means it is

specifications are identical for each of the

vital that the unit match your planning and

design alternatives—whether your model is

space needs. Before you begin the installation

framed, overlay or stainless steel. Make sure

process, check the exact model number you

that the rough opening dimensions, door

need against the model number on the

swing clearance, electrical service and

shipping carton.

plumbing are correct for the model you are

If the unit you receive does not match your

about to install.

 

requirements, contact your Sub-Zero dealer.

If you are installing Built-In units side by side,

 

a separating filler strip is recommended. Add

 

the filler strip width to the finished rough

 

opening dimension. Complete the installation

 

with the Anchoring Kit (part #4200900), see

 

page 21.

 

IMPORTANT NOTE: To operate properly, the

 

door must open a minimum of 90˚. Use a

 

minimum 3" (76) filler in corner installations to

 

assure a 90˚ door opening. Allow enough clear-

 

ance in front of the unit for full door swing.

 

IMPORTANT NOTE: Make sure the floor under

 

the unit is level with the surrounding finished

 

floor.

4

Image 4
Contents Installation Instructions N T E N T S To O L S a N D M AT E R I a L S R E Q U I R E D T E P R E P a R AT I O N BUILT-INI N S TA L L AT I O N S P E C I F I C AT I O N S E R a L L D I M E N S I O N SL R E F R I G E R ATO R a L L F R E E Z E R S TA L L AT I O N S P E C I F I C AT I O N SModel Model 611G Model 650G D E RModel D E B Y- S I D E Dimensions in parentheses are Grille R E M O V a L Models 601R, 601RG and 601F-framedBUILT-INI N S TA L L AT I O N I N S T R U C T I O N S ANTI-TIPB L O C K I N G K I T Position T H E U N I TTurn power back on to the wall outlet Level T H E U N I TFramed Panel I N S TA L L AT I O N A M E D N E L SFramed P a N E L S I S E D PA N E L S PA RT I a L F R a M E D a C C E S S O RY K I TA M E D R E T RO F I T a C C E S S O RY K I T PA N E L S I G NFramed Panel S P E C I F I C AT I O N S A M E D D O O R PA N E L SA M E D PA N E L S Model 601RN E L G R I L L E O P T I O N PA RT I a L F R a M E D D O O R PA N E L SA M E D N E L S E R L AY N E L S Overlay Panel I N S TA L L AT I O N Overlay P a N E L SOverlay Panel I N S TA L L AT I O N Overlay Grille PA N E L SE R L AY D O O R PA N E L S Overlay Panel S P E C I F I C AT I O N SE R L AY PA N E L S E R L AY G R I L L E P a N E L S D E PA N E L I N S TA L L AT I O N O P T I O N S 24 1/ 4Completing T H E I N S TA L L AT I O N Anchor T H E U N I T O U N I T S a N C H O R E D to G E T H E RI T a N C H O R E D to C a B I N E T RY Hinge a D J U S T M E N TInstallation C H E C K L I S T Completing T H E I N S TA L L AT I O N E G R E E Door StopService I N F O R M AT I O N Mail Address customerservice@ subzero.comS TA L L AT I O N C H E C K L I S T N TA C T F O R M AT I O N0 0