True Manufacturing Company TCGD-50 Shelving Installation DRY Bakery, Shelf Installation

Page 10

True Food Service Equipment, Inc.

INSTALLATION / OPERATION INSTRUCTIONS

SHELVING INSTALLATION ("DRY" BAKERY)

SHELF INSTALLATION:

A.Lift each door up and out of track (do not dis- connect elastic tubing). Stretch elastic surgical tubing and set doors on each side of unit.

B.Locate brackets, lights, shelves, etc. from cabinet interior.

C.Locate shelf supports wrapped in micro foam and install teeth end into stainless pilasters located on interior walls. Adjust to desired height matching right and left pairs. (images 1 & 2).

D.Locate three horizontal lights wrapped in micro foam and install (light side down). Electrical cords should be on the right to plug into side receptacles.

Hang end hooks of light assembly on two shelf supports (left and right) slide assembly forward until it seats in front notch of shelf support.

(image 3).

E.Install rear brackets by sliding end hooks over rear notch of shelf support. (image 4).

F.Locate shelves, install top shelf first. With the front lip (tray stop) up and towards cabinet front, place on top of front light assembly and snap shelf into (2) clips on top of rear bracket (image 5).

G.Plug top light assembly into top receptacle of cabinet interior side wall (image 5).

H.Repeat procedures for remaining two shelves (image 6).

I.Replace doors in track.

5

Snap shelf into position.

6

 

Completed assembly.

1

Install shelf supports. teeth end into stainless pilasters.

2

Adjust to desired height matching right and left pairs.

3

Hang end hooks of light assembly on front notch of shelf supports.

Receptacle

4

cap.

Install rear brackets.

 

WARNING

 

Shelf mounted lighting requires a

 

closed circuit. All plugs must be

 

plugged into side wall receptacles

 

for lights to work. If less than

 

three shelves are installed be sure

7

attached caps are plugged into

receptacle(s) (image 7).

 

Shelf plug.

8

www.truemfg.com

8

Image 10
Contents Curved Glass Display Cases DRY Bakery Page Safety Precautions Proper Disposal of the Display Case USE of Extension CordsHard wiring is required on standard Dry Display Cases For models with Optional 12 30.5 cm cordUncrating Installation / Operation Instructions OwnershipRequired Tools StepLeveling LocatingTools Required Startup Replacement PartsElectrical Instructions NON-REFRIGERATED DRY CurvedConductors and Circuits For lights to work. If less than Shelving Installation DRY BakeryShelf Installation Attached caps are plugged intoCastor Installation Tools Required Unit and checkFormica KIT Installation Formica KIT Components Optional Installing Optional Formica KITRefer to image 1 for placement of Formica panels Cabinet Cleaning Optional Sealing Cabinet to FloorShelf Mounted Bulb Replacement Light Bulb ReplacementInterior TOP Bulb Replacement ONE Year Parts & Labor Warranty