Power Requirements Electrical Specifications: 120V AC, 60Hz. 15A Branch Circuit
Installation Procedure
|
| WARNING: To avoid electrical shock hazard, before installing, | |||
|
| switch power off at the service panel and lock the panel to prevent the | |||
|
| power from being switched on accidentally. | |||
1) | Unpack Hood | Pull hood from outer packaging. Remove and discard all packaging materials. | |||
|
| Remove filter and set aside (See Use and Care manual for removal instructions). | |||
2) | Prepare ductwork | Install | |||
|
| blower outlet until it is snug. Note: verify that the flap opens up (toward the ceiling) | |||
|
| before continuing. See “Prepare Ductwork” on page 4. If necessary, install transi- | |||
|
| tion, thermal break and additional backdraft damper. | |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Figure 2: Prepare Ductwork |
3) Prepare Wall | See “General Information” on page 2 for recommended installation height and |
| “Mounting Requirements” on page 3 for information on wall requirements. |
| Once the preferred height is determined, draw a line at the vertical centerline of |
| the cooking appliance. |
| Use the installation template to locate and mark the screw holes. Drill 1/4” (6 mm) |
| pilot holes (4 holes for hood screws and 2 holes for chimney screws). Install plugs |
English 4