Zephyr ZML-E42AG/AS, ZML-M90AG/AS manual Installation - Ducting Calculation Sheet

Page 7
Installation – Ducting Calculation Sheet

Duct pieces

Equivalent number

 

Total

 

length x used

=

 

3-1/ 4” x 10”

1 Ft.

x (

)

=

Ft.

Rect.,

 

 

 

 

 

straight

 

 

 

 

 

7” Round,

1 Ft.

x (

)

=

Ft.

straight

 

 

 

 

 

8” Round,

1 Ft.

x (

)

=

Ft.

straight

 

 

 

 

 

3-1/ 4” x 10”

15 Ft.

x (

)

=

Ft.

Rect.900

 

 

 

 

 

elbow

 

 

 

 

 

3-1/ 4” x 10”

9 Ft.

x (

)

=

Ft.

Rect.450

 

 

 

 

 

elbow

 

 

 

 

 

3-1/ 4” x 10”

24 Ft.

x (

)

=

Ft.

Rect.900

 

 

 

 

 

flat elbow

 

 

 

 

 

3-1/ 4” x 10”

30 Ft.

x (

)

=

Ft.

Rect.

 

 

 

 

 

wall cap

 

 

 

 

 

with damper

 

 

 

 

 

3-1/ 4” x 10”

5 Ft.

x (

)

=

Ft.

Rect.to

 

 

 

 

 

6” round

 

 

 

 

 

transition

 

 

 

 

 

3-1/ 4” x 10”

20 Ft.

x (

)

=

Ft.

Rect.to

 

 

 

 

 

6” round

 

 

 

 

 

transition

 

 

 

 

 

900 elbow

 

 

 

 

 

6” Round,

15 Ft.

x (

)

=

Ft.

900 elbow

 

 

 

 

 

6” Round,

9 Ft.

x (

)

=

Ft.

450 elbow

 

 

 

 

 

 

Subtotal column 1 =

Ft.

Maximum Duct Length: For satisfactory air movement, the total duct length of a 3 1/ 4” x 10” rectangular 6” or 7” diameter round duct should not exceed 100 equivalent feet.

Duct pieces

Equivalent number

Total

 

length x used

 

=

6”- 8”Round

30 Ft.

x (

)

=

Ft.

wall cap

 

 

 

 

 

with damper

 

 

 

 

 

6”- 8” Round, 30 Ft.

x (

)

=

Ft.

roof cap

 

 

 

 

 

6” round to

1 Ft.

x (

)

=

Ft.

3-1/ 4” x 10”

 

 

 

 

 

rect.

 

 

 

 

 

transition

 

 

 

 

 

6” round to

16 Ft.

x (

)

=

Ft.

3-1/ 4” x 10”

 

 

 

 

 

rect.

 

 

 

 

 

transition

 

 

 

 

 

900 elbow

 

 

 

 

 

7” or 8”

15 Ft.

x (

)

=

Ft.

Round,

 

 

 

 

 

900 elbow

 

 

 

 

 

7” or 8”

9 Ft.

x (

)

=

Ft.

Round,

 

 

 

 

 

450 elbow

 

 

 

 

 

7” or 8”

30 Ft.

x (

)

=

Ft.

Round

 

 

 

 

 

wall cap

 

 

 

 

 

with damper

 

 

 

 

 

7” or 8”

30 Ft.

x (

)

=

Ft.

Round,

 

 

 

 

 

roof cap

 

 

 

 

 

7” round to

8 Ft.

x (

)

=

Ft.

3 1/ 4” x 10”

 

 

 

 

 

rect.

 

 

 

 

 

transition

 

 

 

 

 

7” round to

23 Ft.

x (

)

=

Ft.

3-1/ 4” x 10”

 

 

 

 

 

rect.

 

 

 

 

 

transition

 

 

 

 

 

900 elbow

 

 

 

 

 

 

Subtotal column 2 =

Ft.

 

Subtotal column 1 =

Ft.

 

Total ductwork

 

=

Ft.

Installation – Ducting Calculation Sheet

5

Image 7
Contents Milano Island Use, Care, and Installation GuidePage Hood and Filter Cleaning Table of ContentsINSTALLATION MAINTENANCEREAD AND SAVE THESE INSTRUCTIONS Important Safety NoticeELECTRICAL REQUIREMENTS OPERATIONMODELS ZML-M90AS, ZML-M90AG, ZML-E42AS, ZML-E42AG List of MaterialsPARTS SUPPLIED Installation - Ducting Calculation Sheet DUCTING Installation - Mounting Height & ClearanceSoffit or crawl space OptionsInstallation - Ducting WARNING FIRE HAZARDblower housing & ceiling bracket InstallationSpecifications HoodFIG. B FIG. C Installation - Mounting the HoodFIG. A FIG. E FIG. Dcut-down FIG. F Ductless RecirculationCharcoal Filter Replacements RECIRCULATING KIT REQUIRED IF NO DUCTING IS USEDLights On/Dim/Off Features & ControlsTouch Controls Adjust 6 Speed Levels 15 Min Delay Off 1. Blower On/OffSetting the Filter Change Reminder ReminderFilter Charcoal Filter Change Reminder charcoal filter, if installedMetal Filter Clean Indicator Filter Clean ReminderFeatures & Controls - Metal Mesh Metal Filter Clean Reminder metal mesh filterMetal Filters Maintenance - Hood and Filter CleaningSURFACE MAINTENANCE Metal Filter Dimensionsof the Maintenance - LightsCAUTION Light bulb becomes extremely hot when turned on REPLACING LIGHT BULBSCause TroubleshootingTROUBLESHOOTING PROCEDURES FOR MILANO ISLAND IssueDESCRIPTION List of Parts and AccessoriesReplacement Parts Optional AccessoriesJUN08.0101 Limited Warranty