Zephyr ZML-E42AG/AS, ZML-M90AG/AS manual Installation - Mounting the Hood, Fig. B Fig. C, Fig. A

Page 11
FIG. B

Ceiling Joists Installation – Mounting the Hood

Wood Blocking

1

 

Front

3

Top Support Frame

 

2

Bottom Support Frame FIG. A

Manual background 5

Manual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background 6

Hood/Canopy Manual background

Top Support Frame

front

side

Bottom Support Frame

back

2. Key hole

1. Wider cut out

4

front

FIG. B

FIG. C

Installation – Mounting the Hood

FIG. A

Manual background!Manual background CAUTION: At least two installers are required due to the weight and size of the hood.

1.*Determine desired mounting location on ceiling and add wood blocking (min. 2” x 4”) onto ceiling joists. (FIG. A, #1)

2.Remove screws securing top and bottom support frame together. Adjust support frame to accomodate the desired height and re-assemble using the previously removed screws (2 for each support frame arm). (FIG. A, #2)

3.Fasten top support frame to desired location on ceiling using (4) M4 x 1-1/2” wood screws with washers. (FIG. A, #3) The top support frame should be positioned so the narrow side is facing front to back. FIG. B. Make sure to install the bottom support frame with the wider cut-out section facing the front of the hood. (FIG. C, #1)

4.Remove the (2) metal mesh filters and the (2) black charcoal filter brackets located behind the metal mesh filters. Each bracket is secured to the hood with (4) Philips head screws. (Note: If hood is used in ducted mode the charcoal brackets may be discarded.) Place canopy over blower housing on top of hood and secure to hood body using (4) 3/16” x 8 screws. (FIG D, page 10)

5.Lift hood and align the (4) pre-installed mounting screws on top of hood (FIG. A, #5-6) with the (4) key holes on bottom of support frame. (FIG. C, #2) Slide hood towards the narrow end of key holes to lock into place. Hand tighten each of the (4) screws to secure hood to bottom of support frame.

6.Reinstall the (2) charcoal filter brackets (if recirculating) and metal mesh filters.

*Hood is intended to be mounted to a finished ceiling.

9

Image 11
Contents Milano Island Use, Care, and Installation GuidePage Hood and Filter Cleaning Table of ContentsINSTALLATION MAINTENANCEREAD AND SAVE THESE INSTRUCTIONS Important Safety NoticeELECTRICAL REQUIREMENTS OPERATIONPARTS SUPPLIED List of MaterialsMODELS ZML-M90AS, ZML-M90AG, ZML-E42AS, ZML-E42AG Installation - Ducting Calculation Sheet DUCTING Installation - Mounting Height & ClearanceSoffit or crawl space OptionsInstallation - Ducting WARNING FIRE HAZARDblower housing & ceiling bracket InstallationSpecifications HoodFIG. A Installation - Mounting the HoodFIG. B FIG. C cut-down FIG. DFIG. E FIG. F Ductless RecirculationCharcoal Filter Replacements RECIRCULATING KIT REQUIRED IF NO DUCTING IS USEDLights On/Dim/Off Features & ControlsTouch Controls Adjust 6 Speed Levels 15 Min Delay Off 1. Blower On/OffSetting the Filter Change Reminder ReminderFilter Charcoal Filter Change Reminder charcoal filter, if installedMetal Filter Clean Indicator Filter Clean ReminderFeatures & Controls - Metal Mesh Metal Filter Clean Reminder metal mesh filterMetal Filters Maintenance - Hood and Filter CleaningSURFACE MAINTENANCE Metal Filter Dimensionsof the Maintenance - LightsCAUTION Light bulb becomes extremely hot when turned on REPLACING LIGHT BULBSCause TroubleshootingTROUBLESHOOTING PROCEDURES FOR MILANO ISLAND IssueDESCRIPTION List of Parts and AccessoriesReplacement Parts Optional AccessoriesJUN08.0101 Limited Warranty