Zephyr ZML-M90AG/AS, ZML-E42AG/AS manual Installation - Mounting the Hood, Fig. D, Fig. E, cut-down

Page 12
FIG. D

www.zephyronline.com

Installation – Mounting the Hood

canopy

(Bottom of the hood)

screw holes (4) for the canopy

FIG. D

cut-down

Top support frame cut-downFIG. EManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background 10

Manual background 13Manual background Thick trim piece

Top duct covers

9

 

 

12

Bottom duct covers

11

Thin trim piece

Bottom support frame

FIG. E

7.Install electrical and duct work. Seal duct work with aluminum duct tape.

8.Power up hood and check for leaks around duct tape.

9.*Assemble top duct covers (with louver holes) together using (2) M3 x 6 screws. (FIG. E, #9). Larger screw hole openings should overlap the smaller holes.

10.Secure top duct covers to top support frame using (2) M4 x 8 screws. (FIG. E, #10). Note: If using hood in “ducted mode” the top duct covers may be turned upside-down to hide the louver holes.

11.Assemble bottom duct covers together over top duct covers using the final (4) M3 x 6 screws. Bottom duct covers should rest on top of the hood body. (FIG. E, #11)

12.Insert the (2) thin trim pieces into left and right seams of bottom duct covers. (1 on each side) (FIG. E, #12)

13.Insert the (2) thick trim pieces into left and right seams of top duct covers. (1 on each side)

Note: Because less of the top duct covers will be exposed, it may not be necessary to measure and cut the thick trim pieces with a hack saw before installing them into the top duct covers.

*If using hood in recirculating mode you must install the air diverter plate before assembling the duct covers. Turn to page 11 for instructions.

Manual background!Manual background WARNING: Electrical wiring must be done by a qualified person(s) in accordance with all applicable codes and standards. This range hood must be properly grounded. Turn off electrical power at service entrance before wiring.

10

Image 12
Contents Use, Care, and Installation Guide Milano IslandPage Table of Contents INSTALLATIONMAINTENANCE Hood and Filter CleaningImportant Safety Notice READ AND SAVE THESE INSTRUCTIONSOPERATION ELECTRICAL REQUIREMENTSList of Materials MODELS ZML-M90AS, ZML-M90AG, ZML-E42AS, ZML-E42AGPARTS SUPPLIED Installation - Ducting Calculation Sheet Installation - Mounting Height & Clearance DUCTINGOptions Installation - DuctingWARNING FIRE HAZARD Soffit or crawl spaceInstallation SpecificationsHood blower housing & ceiling bracketInstallation - Mounting the Hood FIG. B FIG. CFIG. A FIG. D FIG. Ecut-down Ductless Recirculation Charcoal Filter ReplacementsRECIRCULATING KIT REQUIRED IF NO DUCTING IS USED FIG. FFeatures & Controls Touch ControlsAdjust 6 Speed Levels 15 Min Delay Off 1. Blower On/Off Lights On/Dim/OffReminder FilterCharcoal Filter Change Reminder charcoal filter, if installed Setting the Filter Change ReminderFilter Clean Reminder Features & Controls - Metal MeshMetal Filter Clean Reminder metal mesh filter Metal Filter Clean IndicatorMaintenance - Hood and Filter Cleaning SURFACE MAINTENANCEMetal Filter Dimensions Metal FiltersMaintenance - Lights CAUTION Light bulb becomes extremely hot when turned onREPLACING LIGHT BULBS of theTroubleshooting TROUBLESHOOTING PROCEDURES FOR MILANO ISLANDIssue CauseList of Parts and Accessories Replacement PartsOptional Accessories DESCRIPTIONLimited Warranty JUN08.0101