Zephyr ESL-M90AS manual Table of Contents

Page 3

Important safety Notice

4

Electrical & Installation requirements

5

Electrical requirements

5

Before installing the hood

5

List of Materials

6

Parts supplied:

6

Parts not supplied

6

Dimensions and clearances

7

Installation Instructions

8

Venting methods

8

Preparation

8

Installation - Ductwork Calculation Sheet

9

Installation

10

Electrical connection

12

Description of the hood

15

Control Ball

16

Remote Control

17

Maintenance

18

Cleaning

18

Grease filter

18

Replacing the light bulb:

18

Trouble Shooting

19

Warranty

20

List of Parts and Accessories

21

www.zephyronline.com

Table of Contents

3

Image 3
Contents JAN06.0101 Page Table of Contents Operation Important safety NoticeElectrical & Installation requirements Before Installing the HoodElectrical Requirements List of Materials Parts SuppliedParts not Supplied Dimensions and clearances Installation Instructions Venting MethodsPreparation Installation Ductwork Calculation Sheet Assembling the duct cover support bracket 3 parts InstallationInstallation Hooks Electrical Grounding Instructions Electrical connectionDuct cover support bracket Description of the hood Description of control ball and hood operation Reset filter saturation signalDescription of the hood Control Ball ControlsDescription of the hood Remote Control Using the Remote ControlRemote Control Maintenance Replacing the Light Bulb MaintenanceCleaning Grease FilterShooting Issue Cause What to doTo Obtain Service Under Warranty WarrantyList of Parts and Accessories GF02IAZRC-00SA