Zephyr ESL-M90AS manual Duct cover support bracket

Page 14

Installation

22.Install duct cover with 2 screws first on duct cover support bracket, then slide the duct lower section towards the bottom.

23.Fit control ball with its molex plug on its housing and twist in place.

a

b

˜ 15°

c

OK!

24.Perform connection between plates from control ball and from electronic box.

25.Fold all cables and plate so to avoid any damage when sliding the lower duct cover towards the bottom.

26 Fix lower duct cover to canopy with 2 screws.

Duct cover support bracket

TOP

VIEW

Upper

Duct coverduct cover support bracket

Plate from electronic box

 

 

Control Ball

Lower

 

duct cover

Housing

Control Ball

Note! consider this drawings as installation aid, dimensions are not respected.

27.Check all light bulbs to make sure they are secure in their sockets.

Turn power on in service panel. Check lights and blower operation.

If range hood does not operate:

Check that the circuit breaker is not tripped or the house fuse blown.

Disconnect power supply. Check that wiring is correct.

14

Image 14
Contents JAN06.0101 Page Table of Contents Important safety Notice OperationElectrical Requirements Electrical & Installation requirementsBefore Installing the Hood Parts not Supplied List of MaterialsParts Supplied Dimensions and clearances Preparation Installation InstructionsVenting Methods Installation Ductwork Calculation Sheet Installation Assembling the duct cover support bracket 3 partsInstallation Hooks Electrical connection Electrical Grounding InstructionsDuct cover support bracket Description of the hood Controls Reset filter saturation signalDescription of the hood Control Ball Description of control ball and hood operationRemote Control Maintenance Description of the hood Remote ControlUsing the Remote Control Grease Filter MaintenanceCleaning Replacing the Light BulbIssue Cause What to do ShootingWarranty To Obtain Service Under WarrantyZRC-00SA List of Parts and AccessoriesGF02IA