Bakers Pride Oven SFW-72 Installation, Instructions For Shipping Damage, Right-Sided SFW

Page 8

Sandwich/Fry Warmer

Installation

 

 

Installation

Serious injury, equipment damage or death could result if attempting to install this unit yourself. Ensure that an authorized BKI service agent installs the unit.

Instructions For Shipping Damage

You are responsible for filing all freight claims with the delivering truck line. Inspect all cartons and crates for damage when they arrive. If there is damage noted to shipping crates or cartons, or, if a shortage is found, note this on the bill of lading (all copies) before signing.

If damage is detected when the equipment is uncrated, immediately call the delivering truck line and follow up the call with a written report indicating concealed damage to your equipment. Ask for an immediate inspection of your concealed damage item. Crating material MUST be retained to show the inspector from the truck line.

Electrical Information And Grounding

Electrocution, equipment failure or property damage could result if an unlicensed electrician performs the electrical installation. Ensure that a licensed electrician perform the electrical installation in accordance with local codes, or in the absence of local codes, with the National Electrical Code, ANSI NFPA 70-20XX.

This unit, when installed by an authorized BKI service agent, must be wired for use in accordance with all applicable local, state, and federal codes. For specific electrical requirements and connections refer to the wiring diagram attached to the unit or provided in the Service Manual.

Installation Instructions

Right-Sided SFW

1.Obtain a suitable countertop location and place the entire unit in position.

2.Measure, mark and cut a hole in the countertop for the Fry Warmer blower pan to fit in according to the following drawing.

6

Image 8
Contents Sandwich/Fry Warmer Warranty Information Limited ONE Year WarrantyTable of Contents Introduction Safety PrecautionsSafety Signs and Messages Safe Work Practices Beware of High VoltageKnow your responsibilities as an Employer Safety Labels Installation Installation InstructionsInstructions For Shipping Damage Electrical Information And GroundingLeft-Sided SFW Left-Sided SFW-72 FW-15L Sandwich/Fry Warmer Installation Controls and Indicators OperationUnit Startup and Preheating Item # DescriptionUnit Shutdown Sandwich Warmer Temperature AdjustmentOperational Guidelines Maintenance Scheduled MaintenanceSFW Cleaning FW-15L CleaningTroubleshooting Fry Warmer will not turn onLamp Replacement RepairReplacement Parts AssembliesSFW Control Panel Assembly Components QTY Description PicturePAN Insert 15 FW SFW/SFW-72 PAN Insert 15 FW FW-15L Wiring Diagrams Figure #SFW SFW-72 FW-15L Sandwich/Fry Warmer LI0272/0908