INSTALLATION EXAMPLES

It is the responsibility of the installer to ensure all ductwork is sized and installed as designed to ensure the system will perform as intended. All air movement devices have a performance curve. The amount of air (CFM) that an HRV/ERV will deliver is directly related to the total external static pressure (E.S.P.) of the system. Static pressure is a measure of resistance imposed on the blower by length of duct work/number of fittings used in duct work, duct heater etc.

Ducting Fifth Port Units

All HRV(D)’s have a fifth duct port on top of the unit. This duct port is for both defrost and the recirculation mode. A motorized damper installed in the port closes during defrost or recirculation temporarily blocking the incoming fresh air-stream, allowing the warm air from the house to circulate through the HRV. You may wish to duct this port to a common clean air room (living room or dining room) so when recirculation is activated, household odors from the kitchen, bathroom or basement won’t be introduced into the living spaces of the home environment.

RADIANT HEATED HOMES

NOTE:

The recirculation function can be accessed with a optional digital control. It allows air to move gently throughout the home without exchanging air to the outside, until needed.

Example diagram only-duct configuration may change depending on model

Fully Dedicated System (new construction)

Stale air drawn from key areas of home (bathroom, kitchen, laundry)

Fresh air supplied to main liv- ing areas

HRV must be balanced

Bedrooms

Exhaust

Bathroom

CentralControl -optional

Fresh air to living room

1800

mm

 

HRV

Fresh Air

Exhaust Air

460 mm

16

Image 16
Contents Ventilators Table of Contents Features SpecificationsOptional Controls Air Quality SensorDimensions Fan Performance Performance DataAirflow TH port for recirculation defrost modelsDmfc Digital Multi-Function ControlHRV-150 Fan PerformanceHRV-200 HRV-300D 5TH port for recirculation defrost Type models only Power Volts 120 VAC Amperage Amps Total Phase Single Phase91 % Outside. The heat recovery venti OperationModes of Operation If the user wishes to stop the unit fromOperation Contd Optional Digital ControlOperation Contd Optional Digital Control DmfcInstallation LocationMounting Clothes dryer Range top Stovetop fan Central vacuum systemInstalling the Ducting To the Weatherhoods Installing Ducts Going to / from OutsideModel Installing Ducts to / from Inside Supply AIR DuctingDirect Connection From HRVInstalling Ducts to / from Inside Contd Dedicated Installation for Existing HomeExhaust Air Ducting For new construction, the rigid ducts are run in the wallsInstallation Examples Ducting Fifth Port UnitsInstallation Examples Contd Partially Dedicated SystemOption Return/Return Method Simplified InstallationBe interlocked with the furnace blower Option Supply/Return Method Pitot Tube Balancing Procedure Air as so to increase the supply air’s temperatureAIR Flow Balancing Place pitot tube a minimum of 18 from blower elbowsAIR Flow Balancing Contd Electronic Balancing Motors HRV 150D & 200D onlyMaintenance Any repairs or maintenanceTo Install the Clean Core and Filters Filters need to be checked regularlyTroubleshooting Low Voltage Control Wiring Connections Electrical ConnectionsElectrical Connections Contd Page Page United States Canada