Amana HRV-150D manual AIR Flow Balancing Contd, Electronic Balancing Motors HRV 150D & 200D only

Page 21

AIR FLOW BALANCING (CONT'D)

AIRFLOW STATION (GRID) METHOD

B

1For this flow measuring station, cut the duct and place the flow measuring station between each station. Make sure that the flow measuring station’s air direction arrow points in the direction of the airflow. Secure the flow measuring station with duct tape.

2Before taking the reading, make sure that the magnehelic gauge is level and at 0. Refer to the flow measuring station’s chart to determine your unit’s airflow velocity.

3Adjust the “Supply Air Out” damper until you reach the desired velocity. Follow the previous steps to adjust the “Exhaust Air Out” damper, if needed.

18”

18”

(457 mm)

(457 mm)

 

Measure

 

here

 

 

Measure

 

here

To avoid airflow turbulence and incorrect readings, the airflow velocity should be measured on steel ducting a minimum of 18” (457 mm) from the unit or elbow and before any transition.

ADJUSTING AIRFLOWS

ELECTRONIC BALANCING MOTORS [HRV 150D & 200D only] -

Motors will be factory set at their full potential depending on speed selected.

When unit is installed you will need to balance the motors for proper operation.

Insert screwdriver and turn clockwise to slow down the motor, you will notice the motor changing speeds while performing this operation. Set to desired cfm.

Use slot screwdriver to

adjust speed/airflow

-

+

 

Fan

21

Image 21
Contents Ventilators Table of Contents Specifications FeaturesOptional Controls Air Quality SensorFan Performance Performance Data DimensionsAirflow TH port for recirculation defrost modelsDigital Multi-Function Control DmfcFan Performance HRV-150HRV-200 HRV-300D Power Volts 120 VAC Amperage Amps Total Phase Single Phase 5TH port for recirculation defrost Type models only91 % Operation Outside. The heat recovery ventiModes of Operation If the user wishes to stop the unit fromOptional Digital Control Operation ContdDmfc Operation Contd Optional Digital ControlLocation InstallationMounting Clothes dryer Range top Stovetop fan Central vacuum systemInstalling Ducts Going to / from Outside Installing the Ducting To the WeatherhoodsModel Supply AIR Ducting Installing Ducts to / from InsideDirect Connection From HRVDedicated Installation for Existing Home Installing Ducts to / from Inside ContdExhaust Air Ducting For new construction, the rigid ducts are run in the wallsDucting Fifth Port Units Installation ExamplesPartially Dedicated System Installation Examples ContdSimplified Installation Option Return/Return MethodBe interlocked with the furnace blower Option Supply/Return Method Air as so to increase the supply air’s temperature Pitot Tube Balancing ProcedureAIR Flow Balancing Place pitot tube a minimum of 18 from blower elbowsElectronic Balancing Motors HRV 150D & 200D only AIR Flow Balancing ContdAny repairs or maintenance MaintenanceTo Install the Clean Core and Filters Filters need to be checked regularlyTroubleshooting Electrical Connections Low Voltage Control Wiring ConnectionsElectrical Connections Contd Page Page Canada United States