Hunter,R.F 83005 manual C15C16, C17

Page 12

C15C16

Drill a hole in the center of each outline.

Insert screws, leaving space between the screw head

 

and the joist. Screws are not provided.

C17

C18

Attach the rails onto the screws.

Tighten screws.

C19

Connect 4” duct and vent to the outside. Tape joints.

If ducting does not fit securely, an adapter may

need to be purchased.

12

C20

Route wires through the strain relief. For supply connection,

use wires suitable for at least 90º C (194º F).

41952-01 3/13/2006

05-HF-008-Eng_3.13.06.indd 12

3/13/06 12:08:57 PM

Image 12
Contents Installation I d e Preventative Maintenance Before Installation X2 DRemove the motor/blower from the housing A12 A14 A15A18 A19A21 A22 B11 B12B13 B15B17 B19B20 B21B22 B23B24 B26 B27Existing Construction accessible from above C11C13 C12 C14C15C16 C17C21 C22C23 C25 C26C28 C29Existing Construction accessible only from below D11D12 D13D16 D17 D18D19 D22 D23Attaching the Grille 13/06 120913 PM Trouble Shooting SolutionWarranty Limited WarrantyDesde Í a S t a l a c i ó nPrecaución Antes de la instalación Llame al Para un reemplazoRetire el motor/soplador del alojamiento Construcción nueva fijación a la viga A160 A21 Vaya al pasoConstrucción nueva suspendido entre vigas De pulgApriete los tornillos B26 B23C11 Ventilador Existente SIN Ventilador Existente Construcción existente accesible desde arribaTaladre un agujero en el centro de cada perfil Apriete los tornillos del aliviador de tensiones Vaya al paso En la página 37 para Fijar la rejilla Construcción existente accesible sólo desde abajo D20 Fijación de la rejilla Instale la lámpara fluorescente incluida Solución de problemas SoluciónGarantía Garantía Limitada