Zanussi ZGF 782 CTN Installation, Gas Connection, Cut Out Size, When the HOB is First Installed

Page 10

Installation

IMPORTANT: This hob must be installed by a competent person to the relevant Gas Standards.

Any gas installation must be carried out by a competent person.

The manufacturer will not accept liability, should the above instructions or any of the other safety instructions incorporated in this book be ignored.

WHEN THE HOB IS FIRST INSTALLED

Once the hob has been installed, it is important to remove any protective materials, which were put

on in the factory.

On the end of the shaft, which includes the G 1/2" threaded elbow, adjustment is fixed so that the washer is fitted between the components as shown in the diagram. Screw the parts together without using excessive force.

Gas Connection

Connection to the gas supply should be with either rigid or semi-rigid pipe, i.e. steel or copper.

The connection should be suitable for connecting to R 1/2" (1/2 BSP male thread).

When the final connection has been made, it is essential that a thorough leak test is carried out on the hob and installation. Ensure that the main connection pipe does not exert any strain on the hob.

Cut Out Size

The dimensions of the cut-out are given in the diagram.

FO 0814

FO 0264

A)End of shaft with nut

B)Washer

C)Elbow

It is important to install the elbow correctly, with the shoulder on the end of the thread, fitted to the hob connecting pipe.

Failure to ensure the correct assembly will cause leakage of gas.

Rectangular cut-out size for hob

Dimensions are given in mm.

FO 2038

10

Image 10
Contents GAS HOB ZGF 782 CTN ZGF 782 CTX Child Safety Important Safety InformationInstallation ServiceContents Description of the Hob Hob burners Using the Wok StandOperation Burner Minimum Maximum DiameterBurners Maintenance and CleaningHob Top Ignition electrodeSomething Not Working? Symptom SolutionCast Iron Pan Supports Instructions for the Installer Engineers technical dataProvision for ventilation Important safety requirementsLocation Gas Connection InstallationWhen the HOB is First Installed Cut Out SizeBuilding over a kitchen unit with door BuildingBuilding over a cupboard or drawer Fitting the Hob into the worktopThis HOB Must be Earthed Supply cable replacementElectrical connections Permanent ConnectionIgnitor Switch Ignitor Unit Wiring DiagramFault Finding Preliminary Electrical Systems CheckIgnition System / Gas Ignition Commissioning To adjust the gas ratePressure Testing Conversion from Natural Gas to LPGService and Spare Parts Customer CareEuropean guarantee Page Page 35687-7802 11/06