Hearth and Home Technologies BE-36-C manual Top Vent Vertical Termination Two Elbows Three Elbows

Page 17

2.Top Vent - Vertical Termination - (continued) Two Elbows

H1

V2

V1

Note: Use SL D- Series components only.

Figure 5.9

Three Elbows

V2

H1

H2

Note: Use SL D- Series components only.

Figure 5.10

V Minimum

 

 

 

H1 Maximum

 

 

BE-36-C NG

BE-36-C LP

 

 

 

90 Elbow Only

 

1-1/2 ft.

457 mm

1-1/2 ft.

457 mm

 

 

 

 

 

 

 

1/2 ft.

152 mm

 

2 ft.

610 mm

1-1/2 ft.

457 mm

 

 

 

 

 

 

 

1-1/2 ft.

457 mm

 

3 ft.

914 mm

3 ft.

914 mm

2-1/2 ft.

762 mm

 

5 ft.

1.5 m

5 ft.

1.5 m

 

 

 

 

 

 

 

3-1/2 ft.

1.1 m

 

7 ft.

2.1 m

7 ft.

2.1 m

 

 

 

 

 

 

 

4-1/2 ft.

1.4 m

 

15 ft.

4.6 m

15 ft.

4.6 m

 

 

 

 

 

 

 

 

 

H1 MAX. =15 FT (4.6 m)

 

 

V1 + V2 + H1 MAX. = 40 FT (12.2 m)

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE: There MUST be a 25%

 

 

 

 

reduction in total H when using

 

 

 

 

flex vent except when using the

 

 

 

 

simple up and out installation

 

 

 

 

(see Figure 5.3).

 

V Minimum

 

H1 + H2 Maximum

 

BE-36-C NG

BE-36-C LP

 

 

90 Elbow Only

1/2 ft.

152 mm

1/2 ft.

 

152 mm

 

 

 

 

 

 

 

1/2 ft.

152 mm

1 ft.

305 mm

1/2 ft.

 

152 mm

 

 

 

 

 

 

 

1-1/2 ft.

457 mm

2 ft.

610 mm

2 ft.

 

610 mm

 

 

 

 

 

 

 

2-1/2 ft.

762 mm

4 ft.

1.2 m

4 ft.

 

1.2 m

 

 

 

 

 

 

 

3-1/2 ft.

1.1 m

6 ft.

1.8 m

6 ft.

 

1.8 m

 

 

 

 

 

 

 

4-1/2 ft.

1.4 m

14 ft.

4.3 m

14 ft.

 

4.3 m

 

 

 

 

 

 

 

 

H1 + H2 MAX. =14 FT (4.3 m)

 

 

V1 + V2 + H1 + H2 MAX. = 40 FT (12.2 m)

 

V1

Hearth & Home Technologies • BE-36-C, BE-36-CIPI397-981 Rev. V 1/07

17

Image 17 Contents
What to do if you smell gas BE-36-CIPIHomeowner Reference Information CongratulationsTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Getting Started Design and Installation ConsiderationsInspect Appliance and Components Tools and Supplies NeededModels Framing and ClearancesSelecting Appliance Location Clearances Constructing the Appliance ChaseClearances to Mantels or other Combustibles above Appliance Mantel ProjectionsSee .4 for specific clearances Termination LocationsVent Termination Minimum Clearances Minimum Clearances for Termination Alcove ApplicationsVent Table Key Vent Information and DiagramsUse of Elbows Measuring Standards Use of Flex Vent Two Elbows Vent DiagramsTop Vent Horizontal Termination One Elbow Top Vent Horizontal Termination Three Elbows Baffle Instruction Top Vent Vertical Termination No Elbows V1 = 44 ft. Max .4 mMinimum H1 Maximum Top Vent Vertical Termination Two Elbows Three ElbowsPage Rear Vent Horizontal Termination- Three elbows Rear Vent Horizontal Termination- Two elbowsRear Vent Horizontal Termination Two elbows Rear Vent Horizontal Termination- One elbowRear Vent Horizontal Termination- Three elbows Pipe Clearances to Combustibles Wall Penetration Framing Vent Clearances and FramingCombustible Wall Penetration Non-Combustible Wall PenetrationInstalling Attic Shield Installing the Ceiling FirestopVertical Penetration Framing 10 IN. X 10Choosing the Top or Rear Vent Appliance PreparationCut the metal retaining band and fold the sides out Rear VentFire Risk Prevent contact with sagging, loose insulation Securing and Leveling the ApplianceAssembly of Vent Sections DVP Pipe only Installing Vent PipeAttaching Vent to the Firebox Assembly Assembling Pipe SectionsAssembling DVP-12A Slip Sections Assembling Minimum Installations MI SectionsDVP Pipe only Disassembly of Vent SectionsSecuring the Vent Sections Vertical Sections Horizontal SectionsInstall Support Brackets Assembly of Vent Sections SL Series Pipe onlyAttach the First Vent Component to Starting Collars Continue Adding Vent ComponentsHeat Shield Requirements for Horizontal Termination Installing the Horizontal Termination CapFire Risk. Explosion Risk Installing Roof Flashing and Vertical Termination Cap 20 Assembling the Storm Collar Around the Pipe Assembling and Installing Storm CollarFuel Conversions Gas Connection Gas InformationGas Pressures Pressure Natural Gas PropaneHigh Altitude Installations Electrical Information Recommendation for WireConnecting to the Appliance Intellifire Ignition System Wiring Standing Pilot Ignition System WiringWall Switch Installation for Fan Optional Junction Box InstallationSee for combustible/non-combustible definitions FinishingFacing Material Clean the Appliance Appliance SetupAccessories Remove Shipping MaterialsPositioning the Logs Log Set Assembly LOGS-BE-36-C Models BE-36-CRemoving Glass Assembly Glass AssemblyReplacing Glass Assembly Shutter SettingsBefore Lighting Appliance Operating InstructionsLighting Appliance Turn on all electric power to the applianceStanding Pilot Ignition For Your Safety Read Before Lighting InstructionsAfter Appliance is Lit Frequently Asked QuestionsInitial Break-in Procedure Standing Pilot Ignition System TroubleshootingSymptom Possible Causes Corrective Action Symptom Possible Cause Corrective Action TroubleshootingSympton Possible Cause Corrective Action Intellifire Ignition SystemSure must not exceed 14 in. W.C Maintaining and Servicing Appliance Recommend addition of screen if one is not present Inspect Maintenance TasksReference Materials Appliance Dimension DiagramDVP45 45 Elbow Vent Components DiagramsDVP-TRAP 13-1/4 24-5/8 625 mm367 mm 13-7/8 352 mm 241 mm10-1/2 98 mmVertical Termination Cap 184 mm 12-1/2 318 mm 133 mm Vertical Termination Cap High windPipe Length/Inches SL Series Vent ComponentsLog Set Assembly Service PartsAdditional service part numbers may appear on the following ÎC. Service Parts List BE-36-CStanding Pilot IPI SystemStanding Pilot Valve Assembly Service Parts BE-36-CBE-36-CIPI IPI Valve AssemblyHearth & Home Technologies Limited Lifetime WarrantyContact Information