Hearth and Home Technologies BE-36-C 98 mm, 10-1/2, Vertical Termination Cap High wind, 25 mm

Page 58

B. Vent Components Diagrams (continued)

1-1/2 in.

(38 mm)

14 in.

(356 mm)

12in.

(305 mm)

DVP-TB1

Basement Vent Cap

7-3/8 in.

(187 mm)

3-7/8 in.

(98 mm)

17-3/4 in.

 

(451 mm)

10-1/2 in.

 

 

(267 mm)

DVP-TV

Vertical Termination Cap

7-1/4 in.

(184 mm)

12-1/2 in.

(318 mm)

5-1/4 in.

(133 mm)

 

DVP-TVHW

PVK-80

Vertical Termination Cap (High wind)

 

(For use with IPI and DSI appliances only.)

 

 

 

 

7-1/4 in.

16-7/8 in.

14 in.

1 in.

(184 mm)

(429 mm)

(356 mm)

(25 mm)

 

12 in.

(305 mm) 14 in.

(356 mm)

7-1/8 in.

12-1/8 in.(181 mm)

(314 mm)

 

8-3/4 in.

3/8 in. (10 mm)

 

1 in. (25 mm)

 

(222 mm)

 

 

 

 

7-3/4 to 10-3/8 in.

1-5/8 in.

 

(197 to 264 mm)

 

 

(41 mm)

 

 

DVP-FBHT

DVP-HPCFire Brick Termination Cap

High Performance Cap

Figure 16.5 DVP vent components

58

Hearth & Home Technologies • BE-36-C, BE-36-CIPI397-981 Rev. V 1/07

Image 58 Contents
BE-36-CIPI What to do if you smell gasCongratulations Homeowner Reference InformationTable of Contents Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Inspect Appliance and Components Design and Installation ConsiderationsGetting Started Tools and Supplies NeededSelecting Appliance Location Framing and ClearancesModels Constructing the Appliance Chase ClearancesMantel Projections Clearances to Mantels or other Combustibles above ApplianceVent Termination Minimum Clearances Termination LocationsSee .4 for specific clearances Alcove Applications Minimum Clearances for TerminationUse of Elbows Vent Information and DiagramsVent Table Key Measuring StandardsUse of Flex Vent Top Vent Horizontal Termination One Elbow Vent DiagramsTwo Elbows Top Vent Horizontal Termination Three Elbows Top Vent Vertical Termination No Elbows V1 = 44 ft. Max .4 m Baffle InstructionTop Vent Vertical Termination Two Elbows Three Elbows Minimum H1 MaximumPage Rear Vent Horizontal Termination- Two elbows Rear Vent Horizontal Termination- Three elbowsRear Vent Horizontal Termination- One elbow Rear Vent Horizontal Termination Two elbowsRear Vent Horizontal Termination- Three elbows Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration Framing Non-Combustible Wall PenetrationVertical Penetration Framing Installing the Ceiling FirestopInstalling Attic Shield 10 IN. X 10Appliance Preparation Choosing the Top or Rear VentRear Vent Cut the metal retaining band and fold the sides outSecuring and Leveling the Appliance Fire Risk Prevent contact with sagging, loose insulationAttaching Vent to the Firebox Assembly Installing Vent PipeAssembly of Vent Sections DVP Pipe only Assembling Pipe SectionsAssembling Minimum Installations MI Sections Assembling DVP-12A Slip SectionsSecuring the Vent Sections Vertical Sections Disassembly of Vent SectionsDVP Pipe only Horizontal SectionsAttach the First Vent Component to Starting Collars Assembly of Vent Sections SL Series Pipe onlyInstall Support Brackets Continue Adding Vent ComponentsInstalling the Horizontal Termination Cap Heat Shield Requirements for Horizontal TerminationFire Risk. Explosion Risk Installing Roof Flashing and Vertical Termination Cap Assembling and Installing Storm Collar 20 Assembling the Storm Collar Around the PipeGas Pressures Gas InformationFuel Conversions Gas Connection Pressure Natural Gas PropaneHigh Altitude Installations Connecting to the Appliance Recommendation for WireElectrical Information Standing Pilot Ignition System Wiring Intellifire Ignition System WiringJunction Box Installation Wall Switch Installation for Fan OptionalFacing Material FinishingSee for combustible/non-combustible definitions Accessories Appliance SetupClean the Appliance Remove Shipping MaterialsLog Set Assembly LOGS-BE-36-C Models BE-36-C Positioning the LogsReplacing Glass Assembly Glass AssemblyRemoving Glass Assembly Shutter SettingsOperating Instructions Before Lighting ApplianceTurn on all electric power to the appliance Lighting ApplianceFor Your Safety Read Before Lighting Instructions Standing Pilot IgnitionInitial Break-in Procedure Frequently Asked QuestionsAfter Appliance is Lit Symptom Possible Causes Corrective Action TroubleshootingStanding Pilot Ignition System Troubleshooting Symptom Possible Cause Corrective ActionIntellifire Ignition System Sympton Possible Cause Corrective ActionSure must not exceed 14 in. W.C Maintaining and Servicing Appliance Inspect Maintenance Tasks Recommend addition of screen if one is not present Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP45 45 ElbowDVP-TRAP 367 mm 24-5/8 625 mm13-1/4 13-7/8 352 mm 241 mmVertical Termination Cap 184 mm 12-1/2 318 mm 133 mm 98 mm10-1/2 Vertical Termination Cap High windSL Series Vent Components Pipe Length/InchesService Parts Log Set AssemblyStanding Pilot ÎC. Service Parts List BE-36-CAdditional service part numbers may appear on the following IPI SystemService Parts BE-36-C Standing Pilot Valve AssemblyIPI Valve Assembly BE-36-CIPILimited Lifetime Warranty Hearth & Home TechnologiesContact Information
Related manuals
Manual 37 pages 30.79 Kb