4. Rigid Pipe Connections:

If rigid pipe is used as a gas supply line, a combination of pipe fittings must be used to obtain an in-line connection to the cooktop. All strains must be removed from the supply and fuel lines so cooktop will be level and in line.

Use joint compounds and gaskets that are resistant to action of natural or propane gas on all male pipe threads.

Do not over tighten gas fitting when attaching to pressure regulator. Over tightening may crack regulator.

5. Leak Testing:

IMPORTANT: Leak testing of the appliance shall be conducted as follows:

After final gas connection is made, turn on manual gas valve and test all connections in gas supply piping and appliance for gas leaks with a soapy water solution. During this test all appliance gas valves have to be closed.

In order to avoid property damage or serious personal injury, never use a Iighted match. If a leak is present, tighten joint or unscrew, apply more joint compound, tighten again and retest connection for leak.

CONVERSION TO LP/PROPANE GAS

Every cooktop is provided with a set of injectors for the various types of gas.

Select the injectors to be replaced according to the table below.

The nozzle diameters, expressed in hundredths of a millimetre, are marked on the body of each injector.

SETTING THE PRESSURE REGULATOR (fig. 5.5)

1.Unscrew the regulator cover;

2.Unscrew the A component, reverse and screw it according to the LP/PROPANE regulation.

1

2

A

NATURAL GAS

LP/PROPANE

REGULATION

REGULATION

Fig. 5.5

16

Image 16
Contents Model VEGCT424F Dear Customer Important Precautions and Recommendations Tips for the UserFeatures Cooking PointsGAS Burners Using the gas cooktopChoice of Burner fig Cleaning and maintenance Correct Replacement of the Burners Correct Position of Triple Ring BurnerInstallation Instructions Tools Needed for InstallationReplacement Parts Electrical Grounding InstructionsInstallation to the cabinet Cooktop DimensionsProximity to Side Cabinets Fastening the Cooktop .3Explosion Hazard Gas connectionManual Shut-off Valve fig Pressure Regulator Installation Step GAS Connection Specification GasketFlexible Connections Screw Manifold Test point Pressure NPT UnscrewLeak Testing Setting the Pressure Regulator figRigid Pipe Connections Conversion to LP/PROPANE GASRegulating the Burner Minimum Setting Operations to be Performed When Substituting the InjectorsInjectors Table Electrical connection Recommended ground methodWiring Diagram Caca CA CA Wiring diagram keyCod -ß1