
Belts, Controls and Linkages
Auger/Impeller Drive Control Linkage — All Other Models
There are two adjustment mechanisms used. One has a clevis with a jam nut. The other has a rod going through a loop with a flange nut on either side.
1.Thread a hex flange nut (flange side down) onto upper control rod located on right handle (Figure 53).
6.Remove the belt cover (refer to "REPLACING THE AUGER/IMPELLER DRIVE BELT", page 2 - 1, steps
7.Adjust the clevis or two flange nuts to obtain this dimension, then tighten the two nuts or jam nut securely (Figure 55).
|
|
|
|
|
|
|
|
| Figure 53 | 654 | |
1. | Traction rod | 4. | Flange nut | ||
2. | Loop | 5. | Locking flange nut |
3.Lower traction rod
2.Install lower link through outer hole in lower control rod.
3.Insert upper control rod through loop in lower link control rod.
4.Thread a flange lock nut (flange side up) onto bottom of upper control rod below loop in lower link.
5.Check the distance between the top of the handgrip and the bottom of the auger/impeller control lever (Figure 54). This is a preliminary setting only.
|
|
|
|
|
| Figure 55 | 649 | ||
1. | Jam nut | 4. | Lower control rod | |
2. | Clevis | 5. | Clevis pin | |
3. | Upper control rod | 6. | Cotter pin |
8.The auger must stop when the handgrip is released. If it does not stop, adjust the clevis or flange units on the auger rod.
|
|
|
|
|
|
|
| Figure 54 | 665 | ||
1. | Traction control | 3. | 4 3/8 in. (11 cm) | ||
| lever | 4. | 1 to 2 in. (2.5 to | ||
2. | Handgrip |
| 5 cm) |
2 - 8 | Two Stage Snowthrower Drive Systems Manual |