Sterling Plumbing 6065, 6075 manual Install the Top Track, Install the Shelving Units and Hooks

Page 9

A

Top

Track

Wall Jamb

Inside of

Bath

Outside

of Bath

Bottom Track

8. Install the Top Track

Measure the distance (″A″) from wall to wall at the top of the wall jambs.

Mark the top track at the measured cutting dimension (″A″).

NOTE: For best results use a 32-teeth per inch hacksaw and miter box.

Cut the top track on the inside edge of the mark [approximately 1/32″ (1 mm) from the mark] to allow space for the top track to slide into place easily.

Carefully ®le the rough edges smooth where the top track was cut, taking care to avoid damaging ®nished surfaces.

Position the top track over the wall jambs and storage column and gently push down.

9. Install the Shelving Units and Hooks

Install each shelf by setting them down over two supports and pressing down.

On the shelf of your choice, clip the two hooks onto any portion of the front of the shelf.

Sterling

9

1035946-2-B

Image 9
Contents Installation Guide Thank You For Choosing Kohler Company Tools and MaterialsBefore You Begin PlusParts Identication Parts Identication Locate the Bottom Track Determine the Installation Conguration Mark the Wall Jamb Locations Install the Wall Jambs Install the Center Jamb Install the Storage ColumnInstall the Shelving Units and Hooks Install the Top TrackInstall the Bumpers and Screw Covers Install the Center Jamb BumperInstall the Screw Covers Install the Rollers Inside Panel Install the Rollers Outside PanelInside PanelOutside Panel Install the Door Panels Install the Panel Guide Install the Pile SealCarefully apply caulk or sealant where Final CaulkingOutils et matériels Merci davoir choisi la compagnie KohlerAvant de commencer Identication des pièces Identication pièces Déterminer lemplacement du rail inférieur Déterminer la conguration de linstallationMarquer les emplacements du montant du mur La baignoire Installer les montants du murInstaller le montant du mur central Installer la colonne dentreposageInstaller les unités détagères et crochets Installer le rail supérieurInstaller les amortisseurs et les cache-vis Installer lamortisseur du mur centralInstaller les cache-vis Installer les rouleaux Panneau intérieur Installer les rouleaux Panneau extérieurPanneau intérieur Installer les panneaux de porte Installer le guide de panneau Installer le joint de la pileMastiquer avec précaution ici Mastic nalGracias por elegir los productos de Kohler Herramientas y materialesAntes de comenzar MásIdenticación de las piezas 1035946-2-B Español-3 Sterling Sitúe el carril inferior Determine la conguración de la instalaciónMarque el lugar de instalación de las jambas murales El interior de la bañera Instale las jambas muralesInstale la jamba central Instale la columna estanteríaInstale los estantes y los ganchos Instale el carril superiorInstale los topes y los cubre tornillos Instale el tope de la jamba centralInstale los cubre tornillos Instale las ruedas panel interior Instale las ruedas panel exteriorPanel interior Instale los paneles de la puerta Instale la guía del panel Instale el sello de felpaAplique sellador con cuidado en donde Sellado nal1035946-2-B 1035946-2-B 1035946-2-B Phone 1-888-STERLING Mexico SterlingPlumbing.com