Servis-Rhino 2409TL manual Pre-Operation Inspection and Service

Page 57
(SL-36)
(SG-21)

OPERATION

6. Pre-Operation Inspection and Service

Periodically inspect all moving parts for wear and replace when necessary with authorized service parts. Look for loose fasteners, worn or broken parts, and leaky or loose fittings. Make sure all pins have cotter pins and washers. Serious injury may occur from not maintaining this machine in good working order.

Never work under the Implement, the framework, or any lifted component unless the Implement is securely supported or blocked up to prevent sudden or inadvertent falling which could cause serious injury or even death.

Before each use, a pre-operation inspection and service of the implement and tractor must be performed. This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped and functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time and repair cost can be avoided. OPS-L-0026

2409TL 01/11

Operation Section 4-11

© 2011 Alamo Group Inc.

OPERATION

Image 57 Contents
2409TL To the Owner/Operator/Dealer Table of Contents Maintenance Section Safety Section General Safety Instructions and Practices Safety2409TL 01/11 Safety Section Operator Safety Instructions and Practices Safety Equipment Operation Safety Instructions and Practices SG-36 Safety Safety SL-33 Safety Safety Transporting Safety Instructions and Practices Maintenance and Service Safety Instructions and Practices Safety Concluding Safety Instructions and Practices Storage and Parking Safety Instructions and PracticesDecal Location QTY Level Description Decal Description Loader Positions 2409TL 01/11 Safety Section Loader Safety Safety Safety Federal Laws and Regulations Introduction Section Introduction Introduction Introduction Before Operating this Machine Page Assembly and Connecting the Loader Section Assembly Instructions Assembly2409TL 01/11 Assembly Section Proper Ballasting and Wheel Spacing Mounting Loader Dismounting and Mounting Mid-Mount LoaderAssembly Dismounting Loader Attaching Pin on BucketAssembly Assembling Quick Attach Device Installing Quick Attach Device When Connecting an Attachment to the Loader Quick Hitch Connecting AttachmentAssembly Operation Section Operation Standard Equipment and Specifications Operator Requirements Operation Personal Protective Equipment PPE Tractor Requirements Rops and Seat Belt Tractor Lighting and SMV Emblem Tractor Ballast Getting On and Off the TractorDismounting the Tractor Boarding the TractorStarting the Tractor Pre-Operation Inspection and Service Loader Pre-Operation Inspection/Service Tractor Pre-Operation Inspection/ServiceMount Assembly OPS-L-0007A Do not Operate an Unsafe Tractor or Front END Loader Front END Loader PRE-OPERATION Inspection Driving the Tractor and Loader Driving the Tractor and Loader Operating the Tractor and Loader Operation Operation SL-33 Operation Filling the Bucket Operating the LoaderOperation Lifting the Load Operation Dumping the Bucket Operating with Float Control Loading from a Bank Operation Peeling and Scraping Loading LOW Trucks or Spreaders from a Pile Backfilling Operation Handling Large Heavy Objects Operating Bale Spear Optional Attachment Loader Storage Transporting the Tractor and Implement Operation Transporting on Public Roadways Hauling the Tractor and Implement Trouble Possible Cause Possible Remedy Troubleshooting GuideProblem Possible Cause Remedy Maintenance Section Maintenance 2409TL 01/11 Maintenance Section Lubrication Schedule Adjusting Bucket Level IndicatorDaily Maintenance Lift and Bucket Cylinder Disassembly Cylinder ServiceStorage Lift and Bucket Cylinder ReassemblyMaintenance Proper Torque for Fasteners Maintenance Maintenance Rhino To the OWNER/OPERATOR/DEALER 2409TL