SETUP
GBW/GBWE SETUP
1.Set the GBW on a fi rm level surface where there is enough space around the pentapod for the outriggers to be deployed.
2.Remove the pentapod from the carrying case. The pentapod outriggers are secured together with a strap. See Figure 6. Squeeze both tabs on the buckle to unlock strap and release pentapod outriggers.
SQUEEZE
STRAP
BUCKLE
PENTAPOD
OUTRIGGER
Figure 6. Releasing Pentapod Buckle
3. Lift mast up and deploy the pentapod as shown in Figure 7.
DEPLOY
PENTAPOD
Figure 7. Deploying the Pentapod
4.With pentapod fully deployed, hook the latch to lock the pentapod in place. The latch can be hooked in the
upper or lower position. Placing the lock in the upper position will provide 1 foot (305 mm) more height. See Figure 8.
LATCH
UPPER
POSITION
LOWER
POSITION
Figure 8. Securing the Pentapod
5.For the GBWE, attach the extension pole to the top of the mast as shown in Figure 9.
EXTENSION
POLE
BOLT
Figure 9. Attaching Extension Pole (GBWE)
6.To improve stability and prevent tipping of the lighting system, place sand bags on the outriggers or similar weight on the weight hook as shown in Figure 10.
WEIGHT HOOK
WEIGHT
SANDBAG
Figure 10. Sand Bags and Weight
PAGE 18 — GLOBUG LIGHTING SYSTEM • OPERATION AND PARTS MANUAL — REV. #0 (07/23/09)