IPSO T30, T45 installation manual On-Premise Laundry Planning Handbook

Page 1

On-Premise

Laundry

Planning

Handbook

T477C

T477C

T30 and T45 Tumblers

Refer to Installation manual for full instructions.

4-08-43R5 August 2011

Image 1
Contents On-Premise Laundry Planning Handbook Contents Model Identification IntroductionConversion Table Multiply To Obtain Tumblers T30 and T45Pounds kg Steam Coil Rating at 100 psig Boiler Horsepower Btu/hrCylinder Size Inches mmModels T30 Cabinet DimensionsModels Rear Exhaust Exhaust Outlet LocationsModels Gas Connection Gas Connection LocationsElectrical Connection Locations Models Inlet Outlet T30 Steam Connection LocationsUpper LowerPre-Installation Inspection InstallationW056R1 TMB2110N Layout Exhaust RequirementsMake-Up Air VentingDuct Equivalent Length of Rigid Diameter Straight Duct Individual VentingManifold Venting T438I Mm Duct Duct T30 T45TWO Manifold Assemblies Duct T30 T45 Station Mm DuctElectrical Requirements for Gas and Steam Models Current Terminal Block Recommended FuseMinimum Connections Amps Or Breaker Rating Poles Conductor SizeTerminal Block Recommended Electrical Requirements for Electric ModelsCurrent Breaker Minimum Connections Amps Poles Conductor Size Required