G e n e r a l P r e - O p e r a t i o n I n s t r u c t i o n s
Priming Pump For Electric Packs
The Power pack system is located under the wood skirt. The equipment can be serviced by simply opening the doors.
It is important to make sure that all of the air is out of the equipment pack before operating. To do this follow procedures below:
Turn off power at the breaker
Make sure the gate valves are open
Fill the spa with water going thru the filter
Turn the power on at the breaker
Start the pump on
one to two minutes. (The pump is
Restart the pump. Within one to two minutes, it should be primed
Air Blower | Ozonator | Equipment Pack | |
(Optional) | |||
|
|
Auxiliary Pump | Flow Thru |
| 2 Speed |
(Optional) | Heater | Gate Valves | High Performance |
Circulation | Pump |
| |
Pump |
|
(Optional) |
|
Set thermostat, located on top side control panel to desired temperature, and continue heating until desired temperature has been reached. Depending on equipment, this will normally take 8 to 10 hours.
WARNING: Do not run spa with gate valves closed or run pump with no water circulating in spa for long periods. This could damage the spa equipment.