ASSEMBLY
Figure 5 TUBE ASSEMBLY
5a. Assemble Plugging Spoons (9) to each welded plate (side opposite welds) of all the Tube Assemblies (12 and 13) as shown. For
(24). NOTE:
IMPORTANT Rounded part of spoon fits
against the tube to lock in place.
5b. Insert a Nylon Bearing (15) into each end of the tube assemblies.
(24)
Flat Washer, 5/16"
Qty. 32 used on
15
(28)
Lock Nut, 5/16"
Qty. 24 for
Qty. 32 for
9
28
13
24
20
15
|
| (15) | (20) |
| |||
Nylon Bearing, 3/4" I.D. | Hex Head Bolt, 5/16" x 3/4" | ||
| Qty. 6 for | Qty. 24 for | |
| Qty. 8 for | Qty. 32 for |
Figure 6 | TINE ASSEMBLY | One or more Machinery Bushings as required to | |||
|
|
| |||
6a. The End Tube Assemblies (12) have one | eliminate any side play in axle assembly. |
| |||
26 |
|
| |||
plate approximately |
|
| |||
12 | 15 |
| |||
tube. The Center Tube Assemblies (13) have |
| ||||
|
| ||||
each plate approximately |
| 26 |
| ||
the tube. |
|
|
| ||
|
| 13 |
| ||
|
|
|
|
| |
6b. | Place a Machinery Bushing (26) over Axle |
| 26 | 12 | |
Assembly (10). Insert Axle Assembly through |
|
| |||
|
| 26 | |||
Right Side Plate and install in the following order: |
|
| |||
|
|
| |||
• End Tube Assembly (12) with short hub end |
|
|
| ||
| next to side plate. |
|
|
| |
• | Machinery Bushing (26). |
|
|
| |
• Center Tube Assembly (13). |
|
|
|
10
5
For
•Center Plate (33) and then another Center Tube Assembly (13).
For all models:
•Machinery Bushing (26).
•End Tube Assembly (12) with short hub end next to side plate.
•One or more Machinery Bushings (26) as required to eliminate any side play in axle assembly.
| Make sure Nylon Bearings |
IMPORTANT | |
| (15) are inside Tube |
Assemblies (Installed in Step 5b)
(26)
Machinery Bushing, 3/4"
Qty. 6
8