Blount 853PRO manual Install the bar clamp plate over the bar studs

Page 8

853PRO OPERATOR’S MANUAL

Set-UP

 

 

GUIDE BAR AND DIAMOND CHAIN INSTALLATION

STEP 6

Install the bar clamp plate over the bar studs.

STEP 7

Install the side cover over the bar studs and install side cover nuts. Finger tighten only.

STEP 8

Tension the chain. Do not over tension the diamond chain. Loss of power will result. It is normal for the drivelinks to hang underneath the guide bar. The diamond chain should be snug but be able to be pulled around the guide bar by hand.

STEP 9

Lift up on the nose of the bar and firmly tighten the side cover nuts. To prevent chain tensioner breakage, be sure the side cover nuts are tightened to approximately 20 ft-lbs (27 Nm).

© 2008 ICS, Blount International Inc. Specifications are subject to change without notice. REV0708 F/N 71904

9

Image 8
Contents 853PRO Hydraulic Saw Table of Contents 853PRO OPERATOR’S ManualSymbols & Labels 853PRO OPERATOR’S Manual Safety Following Symbol Applies to ALL the Items Listed on thisGeneral Safety Precautions Safety 853PRO OPERATOR’S ManualFollowing Symbol Applies to ALL Items Listed on this Technical specifications Guide BAR and Diamond Chain Installation Install the bar clamp plate over the bar studs Planning the CUT PRE-CUT ChecklistOperation 853PRO OPERATOR’S Manual Operation Cutting TipsMaintenance 853PRO OPERATOR’S Manual System CLEAN-UPDrive Sprocket Installation 853PRO OPERATOR’S Manual Drive Sprocket RemovalTroubleshooting 853PRO OPERATOR’S Manual TroubleshootingINCH-FOOT Definition ReferenceApproximate Cutting Rates Reference 853PRO OPERATOR’S Manual Performance Loss VS. Hydraulic Hose Length AssumptionsPage 853PRO Operators Manual