Arrow Plastic CL72-A owner manual Before YOU Begin

Page 2

BEFORE YOU BEGIN....

A2

Owner's Manual

Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual.

Important information and helpful tips will make your construction easier and more enjoyable.

Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model. Review all instructions before you begin, and during assembly, follow the step sequence carefully for correct results.

Foundation and Anchoring: Your storage building must be anchored to prevent wind damage. A foundation is also necessary as a base in order to construct a square and level building. Anchoring and foundation materials are not included with your building. We recommend the combined use of an Arrow Floor Foundation Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground (Available by mail order or at your local dealer) or you may construct the foundation and anchoring system of your choice. Your assembly instructions provide information on a few methods commonly used to secure and level a storage building.

Parts and Parts List: Check to be sure that you have all the necessary parts for your building.

•All part numbers can be found on the parts. All of these numbers (before the -) must agree with the numbers on the parts list. The parts list is located on page 12.

•If you find that a part is missing, include the model number of your building and contact:

Arrow Group Industries, Inc. Customer Service Department Route 50 East Breese, Illinois 62230

1-800-851-1085

•Separate contents of the carton by the part number while reviewing parts list. The first few steps show how to join related parts to make larger sub assemblies which will be used later.

•Familiarize yourself with the hardware and fasteners for easier use during construction. These are packaged within the carton. Note that extra fasteners have been supplied for your convenience.

2

Image 2
Contents Model No. CL72-A Before YOU Begin Plan Ahead Required Eye Goggles No Phillips ScrewdriverSafety First Care & Maintenance Other TipsAccessories Anchor KITThis WAS Left Blank Intentionally This WAS Left Blank Intentionally Foundation Foundation For Your BuildingAnchoring Anchoring Down The BuildingHardware Parts List Assembly by Key No Door Header Assembly StepDoor Assembly Sharp EdgeFloor Frame Assembly Corners/Side Angles 1Position right & left front cornerFrames Wall Panels/Rear Header Gables/Roof Rafters Door Jambs Roof Panel/Trim 4Attach the right & left roof trim toShelving/Mid Frame/Track 4Fasten the track tool holder acrossDoor Installation CL72-A