OPERATION
BACKFILLING
Approach pile with a level bucket.
Poor methods actually move no more dirt and make it more difficult to hold a level grade.
Do not use bucket in dumped position for bulldozing. This method, shown above, will impose severe shock loadings on dump linkage, bucket cylinder and tractor.
Leave dirt in bucket. Dumping on each pass wastes time.
1595 01/11 | Operation Section |
© 2011 Alamo Group Inc.