8.1 Installation Requirements and Procedures

8.1.1 Planning the Site

Plan the installation site before installing the cabinet, allowing adequate clearance around the
cabinet for operation and maintenance. Figure 8-1 shows the footprint of a single cabinet and
Figure 8-2 shows the footprint of combined cabinets.
1) Inner wall or reference 2) Cabinet rear 3) outer dimensions of the cabinet
Figure 8-1 Footprint of the cabinet