INSTALLATION AND TESTING
Introduction | This section outlines the sequence for installing the PoE Power Rack, including |
| modules. Test procedures for verifying the integrity of the installation are also |
| included. |
|
|
Guidelines | The device must be installed to allow sufficient front and rear access. All cables must |
| be routed through insulated conduit openings. All service operations can be |
| completed on the front of the power rack. |
|
|
EMI Considerations | When running the DC output cables, ensure that the positive and negative cables are |
| routed so as no loops are created. |
SafetyWARNING:
■Only qualified personnel can install and service the PoE Power Rack.
■Hazardous energy is present in the device and on the interface cables, which can cause electric shock, serious injury, or death if safety precautions are ignored. Follow all safety warnings and practices when servicing this equipment.
Installation Sequence Review all safety warnings in Section 3 before beginning the installation process.
Observe all warnings and labels on the equipment.
The PoE Power Rack consists of a chassis which includes AC and DC distribution modules, one system controller, one power supply module and one power supply module bracket. Refer to Figure 2 and Figure 3 for relationship of components.
Note that the PoE Power Rack is shipped mostly
1Mount chassis
2Install power supply modules
3Ground frame
4Connect to Switch 8800 Chassis
5Connect to loads
6Connect to AC utility/AC grounding
7Initialize the system