3M X62w manual Schedule Setting Continued

Models: X62w

1 84
Download 84 pages 28.27 Kb
Page 33
Image 33
2.5.6 Schedule Setting (Continued)

2. Equipment connection and network setting

2.5 Configuring and controlling the projector via a web browser (Continued)

2.5.6 Schedule Setting (Continued)

 

Item

Description

 

 

 

Specific date No1

Configures the specific date (No.1) schedule.

 

Schedule

Click the [Enable] check box to enable specific date (No.1)

 

scheduling.

 

 

 

Month/Day

Configures the Month and date.

 

Schedule List

Displays the current specific date (No.1) schedule.

Specific date No.2

Configures the specific date (No.2) schedule.

 

Schedule

Click the [Enable] check box to enable specific date (No.2)

 

scheduling.

 

 

 

Month/Day

Configures the Month and date.

 

Schedule List

Displays the current specific date (No.2) schedule.

Specific date No.3

Configures the specific date (No.3) schedule.

 

Schedule

Click the [Enable] check box to enable specific date (No.3)

 

scheduling.

 

 

 

Month/Day

Configures the Month and date.

 

Schedule List

Displays the current specific date (No.3) schedule.

Specific date No.4

Configures the specific date (No.4) schedule.

 

Schedule

Click the [Enable] check box to enable specific date (No.4)

 

scheduling.

 

 

 

Month/Day

Configures the Month and date.

 

Schedule List

Displays the current specific date (No.4) schedule.

Specific date No.5

Configures the specific date (No.5) schedule.

 

Schedule

Click the [Enable] check box to enable specific date (No.5)

 

scheduling.

 

 

 

Month/Day

Set the Month and date.

 

Schedule List

Displays the current specific date (No.5) schedule.

Click the [Apply] button to save the settings.

33

Page 33
Image 33
3M X62w manual Schedule Setting Continued