Manuals
/
Brands
/
Household Appliance
/
Boiler
/
A.O. Smith
/
Household Appliance
/
Boiler
A.O. Smith
DB/DW-720-1810
- page 26
1
26
44
44
Download
44 pages, 911.17 Kb
26
DURA-MAX - MODULATED FIRING - SCHEMATIC DIAGRAM
DURA-MAX - MODULATED FIRING - UNITED STATES & CANADIAN MODELS
WITHOUT PUMP. 120 VOLT SYSTEM CONTROLLER
Contents
Main
MODELS DB/DW-720-1810
NATURAL GAS-FIRED COMMERCIAL CROSS FLOW COPPER BOILERS FOR HYDRONIC HEATING AND HOT WA TER SUPPLY
INSTALLATION OPERATION MAINTENANCE LIMITED WARRANTY
FOREWORD
CONTENTS
REPLACEMENT PARTS
ROUGH-IN DIMENSIONS/ CAPACITIES
INSTALLATION CLEARANCES
LEVELLING
FEATURES
IMPORTANT
SAFETY RELIEF VALVES
ELECTRONIC INTERMITTENT PILOT IGNITION CONTROL
MANUAL RESET HIGH TEMPERATURE SAFETY LIMIT CONTROL
AUTOMATIC RESET HIGH TEMPERATURE LIMIT CONTROL
THERMAL BALANCER
SAFETY FLOW SWITCH
INSTALLATION INSTRUCTIONS
REQUIRED ABILITY
LOCATION
CHEMICAL VAPOR CORROSION
AIR REQUIREMENTS
VENTING THE BOILER
GAS CONNECTIONS
PURGING
HIGH ALTITUDE INSTALLATIONS
WIRING CONNECTIONS
SERVICING WIRING AND/OR CONTROL
SYSTEMS EQUIPMENT INSTALLATION
WATER SUPPLY LINE
EXPANSION TANK
VENT VALVES
SYSTEM HEADERS
CIRCULATING PUMP
LOW WATER CUTOFF
TANK TEMPERATURE CONTROL
SYSTEM INSTALLATION
GENERAL
CONVENTIONAL SPACE HEATING INST ALLA TION
INSTALLATION AS BOILER REPLACEMENT
DB INSTALLATION
Page
BYPASS BALANCING
LINEAR-TEMP SPACE HEATING APPLICATIONS
LINEAR-TEMP SPACE HEATING INSTALLA TIONS
TABLE 7, DuraMax Pump Performance Requirements
Page
Page
Page
Page
Page
Page
Page
Page
HOT WATER SUPPL Y APPLICA TIONS
Cer-Temp 80 Recovery Systems
WATER LINE CONNECTIONS
HARD WATER CONDITIONS
ONE DURA-MAX (MODEL DW) COMMERCIAL BOILER WITH VERTICAL TANK
ONE DURA-MAX (MODEL DW) COMMERCIAL BOILER WITH HORIZONTAL TANK
CAUTION TO PREVENT CONDENSATION THE MINIMUM BOILER INLET TEMPERATURE IS 100F (38C)
SEE TABLE 7 FOR GUIDE TO PIPE AND PUMP SIZING.
TWO DURA-MAX (MODEL DW) HOT WATER SUPPLY BOILERS WITH VERTICAL TANK
TWO DURA-MAX (MODEL DW) HOT WATER SUPPLY BOILERS WITH HORIZONTAL TANK
MANIFOLDING OF MODEL TJV-120M & TJV-200M TANKS
START-UP AND OPERATING INSTRUCTIONS
TWO HORIZONTAL TANK INSTALLATION
THREE HORIZONTAL TANK INSTALLATION
LIGHTING AND OPERATING INSTRUCTIONS
FOR YOUR SAFETY READ BEFORE OPERATING
LIGHTING INSTRUCTIONS
TO TURN OFF GAS TO APPLIANCE
INTERNAL CONTAMINANTS
PRECAUTIONS
CHECKING AND ADJUSTING THE INPUT
PILOT BURNER
MAIN BURNER
PRE-TROUBLE-SHOOTING
TROUBLE-SHOOTING
CHECKING HONEYWELL S8600H OR S8610M (NAT. GAS) INTERMITTENT IGNITION CONTROLS
Page
Page
HEAT EXCHANGER PREVENTIVE MAINTENANCE
DELIMING
GENERAL MAINTENANCE
RELIEF VALVE
VENTING MAINTENANCE
DELIMING SOLVENTS
REMOVING LIGHT DEPOSITS OF SCALE
MECHANICAL REMOVAL OF DEPOSITS
REMOVAL OF AN EXISTING BOILER FROM A COMMON VENTING SYSTEM
DURA-MAX LIMITED WARRANTY