Fast EtherHub-12s User’s Guide

connected hub when using twisted-pair cabling. However, when linking one or more Fast Ethernet repeaters together (i.e., in the same collision domain), the overall length of cable used between any two nodes should not exceed the limits outlined in the IEEE 802.3u standard. In precise terms, the maximum length of cabling that can be run from end-node to end-node is

367m S(repeater equivalent length) + S(length of CAT-5 twisted-pair cable)

This 100BASE-TX Class II device has an inherent repeater delay of 90 bit time or 80 meters of twisted-pair cable. Taking a daisy chain of two hubs connected via twisted-pair cabling for an example, the maximum length from node to node is 367m - (2 x 80m) = 207m. Therefore, if both node A and B are linked to separate repeaters in a two hub system, each using 100 meters of cable to connect to their respective hub, then the inter-hub cabling will be limited to 5 meters (i.e., 207m - 2x100m = 7m, which is then reduced to 5 meters according to a common wiring rule).

Providing Power to the EtherHub

1.Power on the hub by plugging the power cord into the power socket at the rear of the EtherHub (see Figure 4-2), and the other end into a power outlet.

2.Check the LED marked Power on the front panel to see if it is on. The unit will automatically select the setting that matches the connected input voltage. Therefore, no additional adjustments are necessary when connecting it to any input voltage within the range marked on the rear panel.

ΦThe unit supports a “hot remove” feature which permits you to connect/ disconnect cables without powering off the hub and without disrupting the operation of attached devices.

Installing the System

2-5

Page 18
Image 18
Accton Technology FAST ETHERHUB-12S manual Providing Power to the EtherHub