150-409-115-05, Issue 5

Overview

 

 

Table 2 lists the maximum number of EDU-409 List 1 doubler units that can be deployed as a function of the ELU and ERU that are used with it.

Table 2. EDU-409 List 1 Circuit Ranges

 

 

Maximum Number of EDU-409 List 1 Doublers Per

ELU Model

Circuit

 

 

 

 

 

Line Powered Remote

Local Powered Remote(a)

 

 

 

 

ELU-319

List 5D

1

2

ELU-319

List 6D

 

 

 

 

 

 

ELU-319

List 5E

3(b)

2

ELU-319

List 6E

 

 

(a)Requires ERU-412 List 1D and List 2D. ERU-412 List 1E and 2E do not support local power.

(b)Requires ERU-412 List 1E and 2E

Each span can take up to 30 seconds to acquire HDSL synchronization. The total time to acquire end-to-end synchronization increases with the number of spans.

EDU-409 List 1

January 26, 2000

3