Installation
Preparing the wall unit - Extractor version
•The hood is supplied as an
extractor unit. | 190 | 172 | |
Before installing the hood, drill a | 238 | ||
| |||
hole in the roof of the wall unit |
|
| |
(see item. 5). This hole is to allow |
|
| |
passage of the outlet pipe and the |
|
| |
power cable, and to facilitate |
|
| |
servicing. |
|
|
•The wall unit must have a minimum body depth (without
door) of 300 mm with recessed light screen and min. 370 mm with
Preparing the wall unit - Filter version (DF 6160)
•Before installation of the hood in the wall unit, a 115x115 mm hole for the deflector should be cut in the ceiling of the wall unit. Fig.
•Depending on the wall unit height, you need for return air operation a pipe union or additionally a
Fig. 6
Fig. 7
71