14. SPEECH AND FUNCTION TESTS
Using installed equipment, perform both speech and function tests after system programming completion.
14.1. Speech Test
(1) Calls from the substation
•Call the Master Station (telephone) from each substation to check to be sure that a conversation is possible. Also, check to confirm that the master station (telephone) registered in system programming is correctly called.
•Check to be sure that the calling substation number (name) is correctly displayed on the Master Station.
(2) Calls from the master station
•Call the substation and Master Station from each Master Station to check to be sure that a conversation is possible.
•Check to confirm that the designated station is correctly called.
14.2. Function Test
Check each function registered in system programming for correct operation.
For each function's operation, refer to the