Airlink UG-ASW232-1103 manual Unpacking, Installation

Models: UG-ASW232-1103

1 24
Download 24 pages 48.39 Kb
Page 12
Image 12
Unpacking

32-Port 10/100Mbps Ethernet Switch User Guide

Unpacking

Open the shipping cartons of the Switch and carefully unpacks its contents. The carton should contain the following items:

One the 32-port 10/100Mbps Ethernet Switch

One AC power cord

Four rubber feet to be used for shock cushioning

Screws and two mounting brackets

This User Guide

If any item is found missing or damaged, contact your local reseller for replacement.

Installation

The site where you install the hub stack may greatly affect its performance. When installing, consider the following pointers:

Install the Switch in a cool and dry place. See Specifications for the acceptable temperature and humidity operating ranges.

Install the Switch in a site free from strong electromagnetic field generators (such as motors), vibration, dust, and direct exposure to sunlight.

Leave at least 10 cm of space at the front and rear of the hub for ventilation.

Install the Switch on a sturdy, level surface that can support its weight, or in an EIA standard-size equipment rack. For information on rack installation, see the next section, Rack Mounting.

12

AirLink+

Page 12
Image 12
Airlink UG-ASW232-1103 manual Unpacking, Installation