Label 1
1/2
1/2
1/3
Label 2
20
4
Installation and Connection Instructions

Surface

CAUTION
Ensure that the machine is installed on a level oor of
sufcient strength and that the recommended clearances
for inspection and maintenance are provided. Never allow
the inspection and maintenance space to be blocked.
The machine must be placed on a at, solid surface (metal base,
concrete or solid ground). When using a metal base or with machines with
steam heating, the machine must be anchored on the 4 provided
locations (A) (See Label 1) in the base. (See Mounting Bolt Hole
Locations). The height of the pad should not exceed 203 mm - 8 inch.
The machine must be placed entirely level. For easy maintenance it is
recommended to keep a minimal distance of 600 mm - 23.62 inch between
the wall and the back of the machine.
If several machines are placed next to each another, there should be a
minimal distance of 30 mm - 1.18 inch between each machine.
The out of balance switch is mounted on the solid part of the machine.
There is a window around the probe of the out of balance switch that is
mounted on the movable part of the machine.
When the machine goes out of balance by overloading or uneven
distribution of the linen, the out of balance switch will interrupt this action
to prevent damage to the machine.

Important

Out of balance switch

To guarantee good functioning, the probe should be centered
horizontally and vertically at 1/3 from the bottom of the out of
balance window (when machine drum is empty). (See Label 2)
Window
Probe