Allied Telesis 8624T/2M Install SFPs, Check the supply voltage and the switch’s rated voltage

Models: AT-8624POE 8648T/2SP 8624T/2M

1 36
Download 36 pages 1.08 Kb
Page 9
Image 9

Installation & Safety Guide

9

Mount the switch in the rack using standard screws (these are not provided).

7.Install SFPs

For the AT-8648T/2SP, you may also need an optional SFP (Small Form- factor Pluggable module).

Do not look into the optical ports of SFP cables or transceivers. Invisible laser radiation may be emitted from disconnected fibres or connectors.

The SFP transceivers must be inserted the right way into the SFP 49 or SPF 50 slots. See the figure below.

Slide the transceiver into the SFP socket, and firmly press it until it engages. To remove it, first release it by gently pulling the release lever, and then pull it out of the socket. Never force a transceiver into or out of a socket.

When an SFP is installed into one of the two SFP ports, that SFP port takes precedence over its corresponding 10/100/1000T port. When the SFP is removed, the 10/100/1000T port is once again active.

8.Check the supply voltage and the switch’s rated voltage

AT-8600 Series switches are fitted with a universal main power supply that will function over the range 100–240 VAC and 50–60 Hz.

The specific power supply requirements for a particular model are clearly displayed on the rear or underside of the switch. If the supply is outside the accepted range for the switch, the switch may not operate or damage to the switch may result.