AT-9000 Gigabit Ethernet Switch Installation Guide
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the original shipping material if you need to return the unit to Allied Telesis.
2.Place the switch on a level, secure surface.
3.Make sure the following components are included in your switch package. If any item is missing or damaged, contact your Allied Telesis sales representative for assistance.
One
Mounting brackets:
Eight flathead Phillips
AC power cord:
Management cable for local management
52