Installing an Optional SFP Transceiver

AT-FS750/24POE Fast Ethernet Smart Switch Installation Guide

Installing an Optional SFP Transceiver

The AT-FS750/24POE Fast Ethernet Smart switch has two SFP uplink ports.

To install an SFP transceiver, perform the following procedure:

Note

The transceiver can be hot-swapped; you do not need to power off the switch to install a transceiver. However, always remove the cables before removing the transceiver.

Note

You must install the transceiver before you connect cables to it.

1.Remove the transceiver from its shipping container and store the packaging material in a safe location.

Warning

An SFP transceiver can be damaged by static electricity. Be sure to observe all standard electrostatic discharge (ESD) precautions, such as wearing an antistatic wrist strap, to avoid damaging the transceiver.

2. Remove the dust plug from the SFP slot, as shown in Figure 11.

10/100/1000Base-T 25

LASECLASS 1

R PRODUCT

SFP

10/100/1000Base-T

 

26

 

SFP

 

UPLINK

 

PO

 

RTS

1099

Figure 11. Removing the Dust Plug from the SFP Slot

3.Locate the label on the transceiver and turn it so that the label is on top and the alignment groove is on the bottom.

43