Allied Telesis AT-FS750/16, AT-FS750/24 manual Unpacking the Switch

Models: AT-FS750/24 AT-FS750/16 FS750/24 FS750/16

1 44
Download 44 pages 58.93 Kb
Page 30
Image 30
Unpacking the Switch

Chapter 2: Installation

Unpacking the Switch

To unpack the switch, perform the following procedure:

1. Remove all components from the shipping package.

Note

Store the packaging material in a safe location. You must use the original shipping material if you need to return the unit to Allied Telesis.

2.Place the switch on a level, secure surface.

3.Verify that the switch package has the following hardware components. If any item is missing or damaged, contact your Allied Telesis sales representative for assistance.

ˆOne AT-FS750/16 or AT-FS750/24 Smart Switch

ˆTwo rack-mount brackets

ˆEight rack-mount bracket screws (black)

ˆFour rack-mounting screws (stainless steel)

ˆFour rubber feet (for desktop use)

ˆOne management cable

ˆOne power cord

ˆDocumentation CD

30

Page 30
Image 30
Allied Telesis AT-FS750/16, AT-FS750/24 manual Unpacking the Switch