Allied Telesis AT-FS750/16, AT-FS750/24 manual Powering On the Switch

Models: AT-FS750/24 AT-FS750/16 FS750/24 FS750/16

1 44
Download 44 pages 58.93 Kb
Page 38
Image 38
Powering On the Switch

Chapter 2: Installation

Powering On the Switch

To power on the switch, perform the following procedure:

1.Plug the power cord into the AC power connector on the back of the switch, as shown in Figure 14.

871

Figure 14. Plugging in the AC Power Cord

2. Plug the other end of the power cord into a wall outlet.

Warning: Power cord is used as a disconnection device. To de- energize equipment, disconnect the power cord.  E3

Pluggable Equipment. The socket outlet shall be installed near the equipment and shall be easily accessible.  E5

3.Verify that the POWER LED is green. If the LED is OFF, refer to Chapter 3, “Troubleshooting” on page 39.

The switch is now powered on and ready for network operations. For information on how to manage the switch, refer to the AT-S80 Management Software User’s Guide.

38

Page 38
Image 38
Allied Telesis AT-FS750/16, AT-FS750/24 manual Powering On the Switch