Allied Telesis AT-FS750/24, AT-FS750/16 manual Figures

Models: AT-FS750/24 AT-FS750/16 FS750/24 FS750/16

1 44
Download 44 pages 58.93 Kb
Page 7
Image 7
Figures

Figures

Figure 1. AT-FS750/16 and AT-FS750/24 Front Panels

17

Figure 2. AT-FS750/16 and AT-FS750/24 Back Panels

17

Figure 3. AT-FS750/16 and FS750/24 System and Port LEDs

19

Figure 4. Power Workgroup Topology

22

Figure 5. Collapsed Backbone Topology

23

Figure 6.

Attaching the Rubber Feet

31

Figure 7.

Attaching the Rack-Mount Bracket to the AT-FS750/16 Switch

32

Figure 8.

Attaching the Rack-Mount Bracket to the AT-FS750/24 Switch

32

Figure 9.

Mounting the AT-FS750/16 Switch in an Equipment Rack

33

Figure 10. Mounting the AT-FS750/24 Switch in an Equipment Rack

33

Figure 11.

Removing the Dust Plug from the SFP Slot

34

Figure 12. Inserting the SFP

35

Figure 13.

Positioning the SFP Handle in the Upright Position

35

Figure 14.

Plugging in the AC Power Cord

38

Figure 15.

RJ-45 Connector and Port Pin Layout

42

7

Page 7
Image 7
Allied Telesis AT-FS750/24, AT-FS750/16 manual Figures